Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Lead Operative

LOLER: SHEQ 002

LOLER Description.

  • Cranes and other lifting equipment (Lifting Operations and Lifting Equipment Regulations 1998)
    Please acknowledge:
    Reports of the results of every inspection made in pursuance of Regulation 9(3)b and 10(2)b of the Lifting Operations and Lifting Equipment Regulations.
    Inspection period every 7 days
    Lifting equipment includes: Mobile Cranes, lifting frames, goods lifting cage, brick forks, Lorry loaders, gin wheels, fork lifts, trucks and ropes used for access.

Equipment:

  • Add Equipment:

  • Equipment:
  • Description of work equipment and identification number.

  • Picture of equipment:

  • Result of inspection: State appropriate findings including defects

PPE: SHEQ 012

PPE Register

  • Add Operative:

  • Operative:
  • PPE Issued:

  • Date Issued

  • Date Returned

  • Operative name and signature:

PUWER: SHEQ 003

PUWER Description:

  • Inspection of work equipment:
    Please Acknowledge:
    Reports of the results of every inspection made in pursuance of Regulation (1) (a) (b) 2 (a) (b) & (3) of the provision and use of work equipment.
    Inspection period every 7 days
    Work Equipment Includes: Spams, Mixers, Dumper Trucks, Abrasive Wheels, Electric Wheels, Electric Drills, Asphalt Cauldrons & Bitumen Boilers

  • Add Equipment:

  • Equipment 1:
  • Description of work equipment and identification number.

  • Picture of equipment:

  • Result of inspection: State appropriate findings including defects

TOOL BOX TALK: SHEQ 031

Tool Box Talks

  • Tool box talk briefing register: CITB No: 3215901

  • Tool box talk subject:

  • Start Time:

  • End Time:

  • Add Operative:

  • Operative:
  • Operative name and signature:

  • Tool box talk provider:

SITE REVIEW SHEET & CONTRACT REPORT SHEET

Site Review Sheet & Contract Report Sheet

  • Details of area inspected:

The following matters require immediate attention:

  • Add Matters:

  • Matter:
  • Description:

  • Photo:

  • Resolution Method:

  • Resolution Date:

Further details of area inspected:

  • Check exterior of property for damage e.g. Fence, Windows.

  • Cleared?

  • Clearance of snagging list items

  • Cleared?

  • All Rubbish cleared from site?

  • Cleared?

  • Further matters of consideration?

  • Cleared?

FIRE INSPECTION CHECKLIST: SHEQ 005

Fire Inspection Control Items:

  • All combustibles and rubbish being removed regularly from work areas?

  • Fire procedures included in the safety plan. Fire and emergency procedures displayed?

  • Fire extinguishers locations correctly signed and extinguishers stored in the correct locations?

  • Fire extinguishers in good condition and services in last 12 months?

  • Appropriate number of fire extinguishers?

  • Fire extinguishers being inspected weekly for damage?

  • Fire marshals appointed and fire procedure induction completed?

  • Fire escapes and emergency routes correctly signed?

  • Employees trained in the use of fire extinguishers?

  • Fire doors open outwards and unobstructed both sides?

  • Fire escape routes kept clear and adequately illuminated?

  • No smoking and similar warning signs displayed in areas of flammable material storage?

Remedial Actions:

  • Remedial actions required:

  • Remedial Action Completion Date:

Fire control media:

  • Add Photo:

  • Fire Extinguisher
  • Fire extinguisher

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.