Information
-
H7 ELECTRICAL WORK .
-
Project Name: Tabulam New Bridge.
-
Location: BRUXNER HIGHWAY TABULAM
-
Contractor
-
Prepared by
-
Conducted on
Work Activity Record
-
N.A Not Applicable. N.C Not Checked
-
1<br> Is an ‘Electrical Register’ identifying all electrical equipment and inspections conducted being maintained?
-
2<br> Is a program in place for periodic inspecting and testing of electrical equipment by a suitably qualified person?
-
3<br>Are all electrical installations and equipment inspected/tested and tagged in accordance with AS3760 and manufacturers recommendations?
-
4<br>Is a program in place to evaluate compliance of equipment and subsequent action to be taken?
-
5 <br>Are all circuits including portable generators protected by an RCD?
6 Are all flexible cords
-
<br> 10 Amp,<br>
-
Have heavy duty sheaths,
-
No longer than 32m?
-
7<br>Are all generators effectively earthed?
7 Are all electrical leads:
-
<br> Kept off walkways, and<br>
-
Raised off the ground, away from water/corrosive substances/heat/friction or otherwise protected from damage?
-
8<br>Are all defective tools or cords tagged ‘Out of Service’?
-
9<br>Has an ‘Electric Shock Response’ protocol been documented developed and communicated to those exposed to the risk?
-
10<br>Are SWMS being used for all tasks involving interaction with electricity?
-
11<br>Have effective control measures been implemented to eliminate or minimise exposure to electrical energy?<br><br>
12 Have workers and contractors who work with or in the vicinity of electrical equipment/installations, received training in the:
-
<br> nature of the hazards involved, and<br>
-
Methods of controlling exposure to the hazard?
-
13<br>Is adequate signage in place to warn of electrical hazards and/or to restrict access to the area?
-
14<br>Are all switches on electrical equipment correctly identified?
-
15<br>Is live electrical work being undertaken in the presence of a safety observer who is qualified and competent to perform the particular task, and competent in electrical rescue and cardio-pulmonary resuscitation?
-
16<br>Has the isolation point of the relevant electrical supply been clearly identified, and easily accessed and operated quickly?
Compliance and Follow-up action.
-
Is the activity compliant.
-
Surveillance Officer
-
NCPN or memo number.
-
Follow up action
-
Product Non Conformance
-
System Non Conformance
-
Contractor generated NCR
-
Contractor generated a CAR
Matters arising
-
NCPN no
-
Contractors NCR no
-
CAR no
-
Closed out.
-
RMS representative's name