Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Have all team members carried out company/site induction and hold a white card?
-
Are all team members on site wearing the required PPE.
-
Have you referred to the applicable Proplumb SWMS?<br>
-
Does the SWMS cover all risks associated with the job to be undertaken? (if no complete risk assessment before proceeding)
Pre Start checks.
-
Is the site free from damage or vandalism? Eg. Smashed windows, graffiti etc.
-
Are all bench tops and tiles free from scratches and chips within working area?
-
Are all painted walls free from marks & scratches around the work area?
-
Are all shower bases and baths free from damage and scratches?
-
Do you have all the tapware and toilets required for the job?
-
Are all vanity basins, sinks and troughs installed securely and ready for us to fit off?
-
Have all the wall and floor tiles been completed including grout?
-
Is the trough set centre of the trough?
-
Has the solar panel been installed?
-
Have all downpipes and flashing been completed?
-
Has the gas lead in been run 300mm to the L/H side of our fitting line?
-
Is the I.S shaft up and free from damage?
-
Is the S/W overflow up and free from damage?
-
Is the water tapping complete and in good condition?
-
Have you got sufficient material and tools required to finish the job?
-
The above information is true and correct.