  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Have all team members carried out company/site induction and hold a white card?

  • Are all team members on site wearing the required PPE.

  • Have you referred to the applicable Proplumb SWMS?<br>

  • Does the SWMS cover all risks associated with the job to be undertaken? (if no complete risk assessment before proceeding)

Pre Start checks.

  • Is the site free from damage or vandalism? Eg. Smashed windows, graffiti etc.

  • Are all bench tops and tiles free from scratches and chips within working area?

  • Are all painted walls free from marks & scratches around the work area?

  • Are all shower bases and baths free from damage and scratches?

  • Do you have all the tapware and toilets required for the job?

  • Are all vanity basins, sinks and troughs installed securely and ready for us to fit off?

  • Have all the wall and floor tiles been completed including grout?

  • Is the trough set centre of the trough?

  • Has the solar panel been installed?

  • Have all downpipes and flashing been completed?

  • Has the gas lead in been run 300mm to the L/H side of our fitting line?

  • Is the I.S shaft up and free from damage?

  • Is the S/W overflow up and free from damage?

  • Is the water tapping complete and in good condition?

  • Have you got sufficient material and tools required to finish the job?

  • The above information is true and correct.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.