Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
A2O - Composite roof-lights
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
STRUCTURE
-
Primary structure handover complete.
-
Personnel
- Installer
- A2O
Storage
-
Store the material in dry protected conditions, never stacked more than two pallets high.
-
Personnel
Installation Checks
-
Spreader plates fitted at all lap locations (rooflight to rooflight/ rooflight to sheet/ sheet to rooflight)
-
Personnel
- Installer
- A2O
-
Panel end laps - bottom panel to have 40mm bearing onto purlin / spreader plate.
-
Personnel
- Installer
- A2O
-
6mm x 5mm strip mastic installed at panel end laps - 2 rows above fixing point, 1 row below fixing point, bottom row 5mm back from end of panel.
-
Personnel
- Installer
- A2O
-
Check end laps for ineffective seals and seal as necessary.
-
Personnel
- Installer
- A2O
-
6nr primary fixings per panel per purlin - 2 fasteners positioned in raised profile of each corrugation.
-
Personnel
- Installer
- A2O
-
6mm x 5mm strip mastic installed to panel side laps.
-
Personnel
- Installer
- A2O
-
Panel side laps stitched as per manufacturers recommendations.
-
Personnel
- Installer
- A2O
-
Fasteners from the composite sheet above the rooflights must be positioned a minimum of 25mm into the rooflight.
-
Personnel
- Installer
- A2O
-
All fixings must pass through the filler block within the rooflight.
-
Personnel
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: