Title Page

  • Conducted on

DETAILS

  • Client / Site: Manhole Number:

  • Inspection Area:

  • Works Description:

WORK DETAILS

  • Type of plug that is being installed / fitted

  • Diameter of pipe/ outlet to be isolated

INSPECTION CRITERIA

  • Required holding pressure

  • Actual pressure

  • Is the plug & pipe connection maintaining the required pressures when tested<br>

  • Is the pressure controlling device in current calibration

  • Does the plug & connection show signs of any structural damages, breakages or loose fittings

  • Does the plug & pipe connection show signs of stress or distortion to integrity

  • If the plug is anchored or housed to another support connection point, are there any signs this connection is loose or poorly secured

APPROVALS

  • Other Comments

  • Person Completing the Checklist

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.