Title Page
-
Conducted on
DETAILS
-
Client / Site: Manhole Number:
-
Inspection Area:
-
Works Description:
WORK DETAILS
-
Type of plug that is being installed / fitted
-
Diameter of pipe/ outlet to be isolated
INSPECTION CRITERIA
-
Required holding pressure
-
Is the plug & pipe connection maintaining the required pressures when tested<br>
-
Is the pressure controlling device in current calibration
-
Does the plug & connection show signs of any structural damages, breakages or loose fittings
-
Does the plug & pipe connection show signs of stress or distortion to integrity
-
If the plug is anchored or housed to another support connection point, are there any signs this connection is loose or poorly secured
APPROVALS
-
Other Comments
-
Person Completing the Checklist
- Greg Grima
- John Toner
- Shane Dando
- David Howard
- Greg Oman
- Ian McCormick
-
Signature: