Client / Site: Barwon Water - Black Rock WRP Inlet Works Upgrade 400 Black Rock Connewarre
-
Inspection Area:
-
Reference: BW Technical Specification Rev 0 Clause: 39.1 General Requirements 39.2 Environmental Rating 39.3 Technical Requirements 38.26 Labelling
-
Document No. CA-CS-012 ITP No:
VISUAL CHECKLIST
-
Instrument in correct location as per IFC drawings
-
Instrument installed in accordance with manufacturers instruction
-
Instrumentation cabling sharing a cable tray with power cabling is segregated by a metal partition between the two cable types
-
Stainless steel sun hood installed if applicable
-
IP56 for outdoor equipment
-
Location provides easy access for maintenance
-
Location does not impede access to walkways or other items of plant
-
Cable entry at bottom of enclosure / instrument, unless otherwise approved
-
Cable glands and shrouds installed correctly and fit for purpose
-
Screened instrument cables are earthed at MCC end only
-
Separation of dissimilar metals via 3mm insulating spacers
-
Online instruments shall be provided with mechanisms to allow the removal of the sensor under normal operating conditions
-
Instrumentation is to be such that the orientation is to be South Facing unless otherwise approved
-
Electrical connections are tight
-
Earthing satisfactory
-
All seals in good condition and effective
-
Asset and cables labels installed and correct as per P&ID drawings
-
Instrument displays / controllers mounted at1500mm above finished floor level
-
Equipment in new condition / not damaged
-
All fixings are corrosion resistant
-
Notes/Comments
APPROVALS
-
Instrument is
-
Actions to be taken:
-
Entered on Punch List
-
Punch list Reference Number:
-
Item No:
-
Person Completing the Checklist
- Greg Grima
- John Toner
- Shane Dando
- David Howard
-
Signature:
-
Agfab Approval By:
- Greg Grima
- John Toner
- Shane Dando
- David Howard
-
Signature: