Information

  • Audit Title

  • Audit No

  • Analyst

  • Project Manager

  • Reason for Audit

  • Is this person now authorised ?

  • Number of Non Compliances

  • Date of audit

  • Client

  • Site Address

  • Job Number

  • Location and description of works being undertaken

Project Manager - Contract review and planning

  • Has the job number been set up on Tracker correctly ?

  • Are details found in the method statement correct regards the outlined scope of works and requirements for the client ?

  • Has a method statement and risk assessment been accurately completed and signed by the PM?

  • Has all paperwork used by the project manager the latest controlled documents ? Please state them

  • Where the work is project managed has the analyst been provided with all relevant required information like the the latest survey/re-inspection information/Specification ?

  • Where the work is being project managed is the type of works suitably planned and in line with current regulations and guidance ?

  • Is the analyst suitably trained for the tasks undertaken ? Auditor to only authorise staff with evidence of appropriate experience and training

Analyst - Health and Safety and Quality Control

  • Is all required PPE on site ie Hard hats ,Boots, Gloves, HI Viz jacket, goggles ear defenders and disposable overalls and booties if required ?

  • Is the RPE being used in good condition , complete , clean and suitably identified as the analysts mask ? Is the surveyor clean shaven and can demonstrate a good face fit ?

  • Has the analyst filled in his monthly exposure sheet and equipment records and are they up to date ?

  • Is there a copy of the Quality manual, M&S guidance and Hsg 248 & 247 available ?

  • Is the analyst up to date with his their monthly QC's

  • Are filters being used Media/Lab blanked ? Record details / results

  • Are calibration graphs available for the flow meters ?

  • Does the surveyor have copies of all relevant training records available and are they in date ? P402 ,CSCS ,face fits and WAH etc

  • Are COSHH assessments available ?

  • Has a risk assessment been completed ,signed , reviewed and updated where required ?

Analyst - Equipment

  • Is there an adequate number of calibrated pumps and their chargers available ?

  • Has equipment been PAT tested in past 12 months ? Are all cables in good condition and free of tape marks

  • Is there adequate number of cowls and caps present and are they clearly identified ?

  • Is there a calibrated personal pump and a charger available on site?

  • Sufficient clean acetone and triacetate available ?

  • Is there a Vaporiser present ?

  • Tweezers and syringes present ?

  • Adequate amount of slides and cover slips ?

  • Lens tissues and wet wipes available ?

  • Chisel or Screwdriver, torch with spare batteries and a mirror available ?

  • Sample bags available ?

  • Spare fuses and bulbs available ?

  • Microscope being used suffice ? What is the ref number & the next service date?

  • Central telescope present ?

  • Stage micrometer being used ? What is the ref number & the next calibration date ?

  • NPL test slide being used ? What is the red number & the next calibration date?

  • Watch and barometer number used ? What is the ref number & the next calibration date?

  • High Flow meter used ? What is the ref number and next calibration date ?

  • Low flow meter used ? What is the ref number and next calibration date ?

  • That months slide box at hand and in order ?

Analyst- Air Monitoring

  • Does the analyst use a lab van and if so does the lab van comply with the quality manual ? Check for fire extinguisher and bulkhead etc

  • Is the lab area suitable and clean ?

  • Has a lab air test been conducted where required ?

  • For general air monitoring has the analyst reviewed the contractors method statement and understood it ?

  • Has a field blank been conducted ? If required to count what was the result

  • Was filter loading and the initial set up of the air test ok ?

  • What type of air test was witnessed and was it suitably conducted ?

  • Can the Analyst demonstrate the setup of the microscope correctly ?

  • Was filter preparation and slide mounting suitable ?

  • Where witnessed was counting conducted suitably as per HSG 248 ?

  • Where possible has the auditor cross checked 2 slides ? Was the count very different ?

  • We're all other aspects of daily checks and monitoring conducted correctly where we are required to do so?

  • For general air monitoring / previous shifts has paper work been filled in correctly and all sample times , info and calculations correct ?

  • Was a visual check carried out if required to ensure the scope of works has been completed ? The depends on the clients request or duty of care

  • Was a non licensed report required and filled in correctly if requested by the client / PM ?

Summary

  • Please summarise the audit and give any recommendations moving forward.

Project Managers Result

  • Score

  • Audit Result -Satisfactory or Non satisfactory

Analyst Result

  • Score

  • Audit Result -Satisfactory or Non satisfactory

  • Analyst Name and Signature

  • Auditor Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.