Information
-
Audit No
-
Analyst
-
Project Manager
-
Reason for Audit
-
Is this person now authorised ?
-
Number of Non Compliances
-
Date of audit
-
Client
-
Site Address
-
Job Number
-
Location and description of works being undertaken
Project Manager - Contract review and planning
-
Are details found in the method statement correct regards the outlined scope of works and requirements for the client ?
-
Has a risk assessment been completed and all forseable hazards been identified ? If theres an NCR here see below ?
-
Has a site visit or a desk top study been completed ?
-
Has the project manager used the latest controlled documents ? Please state them
-
Where the work is project managed has the analyst been provided with all relevant required information like the the latest survey/re-inspection information/Specification ?
-
Where the work is being project managed is the type of works suitably planned and in line with current regulations and guidance ?
-
Is the analyst suitably trained for the tasks undertaken ? Auditor to only authorise staff with evidence of appropriate experience and training
Analyst - Health & Safety ,Equipment and Quality Control
-
Have any unforseen hazards on site been identified and has the analyst raised these to the client / LARC / PM ?
-
Has the analyst amended and signed the RAMS where required ?
-
Is the RPE being used in good condition , complete , clean and suitably identified as the analysts mask ? Is the analyst clean shaven and can demonstrate a good face fit ?
-
Has the analyst filled in his monthly exposure sheet and equipment records and are they up to date ?
-
Is the analyst up to date with his their monthly QC's
-
Is kit fully complete and compliant ?
-
Are filters being used Media/Lab blanked ? Record details / results
-
Are calibration graphs available for the flow meters ?
-
Is there an adequate number of calibrated pumps and their chargers available ?
-
Has equipment been PAT tested in past 12 months ? Are all cables in good condition and free of tape marks
-
Is there adequate number of cowls and caps present and are they clearly identified ?
-
Is there a calibrated personal pump and a charger available on site?
-
Sufficient clean acetone and triacetate available and are the COSHH assessments available ?
-
Is there a Vaporiser present ?
-
Tweezers and syringes present ?
-
Adequate amount of slides and cover slips ?
-
Lens tissues and wet wipes available ?
-
Chisel or Screwdriver, torch with spare batteries and a mirror available ?
-
Sample bags available ?
-
Spare fuses and bulbs available ?
-
Microscope being used suffice and in service ? What is the ref number & the next service date?
-
Central telescope present ?
-
Stage micrometer being used and in calibration? What is the ref number & the next calibration date ?
-
NPL test slide being used and in calibration ? What is the red number & the next calibration date?
-
Watch and barometer number used and in calibration ? What is the ref number & the next calibration date?
-
High Flow meter used and in calibration ? What is the ref number and next calibration date ?
-
Low flow meter used and in calibration? What is the ref number and next calibration date ?
-
That months slide box at hand and in order ? Note all the monthly slide boxes of he has present if possible
-
Is all required PPE on site ie Hard hats ,Boots, Gloves, HI Viz jacket, goggles ear defenders and disposable overalls and booties if required ?
-
Is there a copy of applicable training records, quality manual and guidence documents available ?
Analyst- Air Monitoring
-
Does the analyst use a lab van and if so does the lab van comply with the quality manual ? Check for fire extinguisher and bulkhead etc
-
Is the lab area suitable and clean ?
-
Has a lab air test been conducted where required ?
-
For general air monitoring has the analyst reviewed the contractors method statement and understood it ?
-
Has a field blank been conducted ? If required to count what was the result
-
Was filter loading and the initial set up of the air test ok ?
-
What type of air test was witnessed and was it suitably conducted ?
-
Can the Analyst demonstrate the setup of the microscope correctly ?
-
Was filter preparation and slide mounting suitable ?
-
Where witnessed was counting conducted suitably as per HSG 248 ?
-
Where possible has the auditor cross checked 2 slides ? Was the count very different ?
-
We're all other aspects of daily checks and monitoring conducted correctly where we are required to do so?
-
Has the shifts paperwork any previous shifts paper work (if possible) been filled in correctly and all sample times , info and calculations correct ?
-
Was a visual check carried out if required to ensure the scope of works has been completed ? The depends on the clients request or duty of care
-
Was a non licensed report required and filled in correctly if requested by the client / PM ?
Summary
-
Please summarise the audit and give any recommendations moving forward.
Project Managers Result
-
Score
-
Audit Result -Satisfactory or Non satisfactory
Analyst Result
-
Score
-
Audit Result -Satisfactory or Non satisfactory
-
Analyst Name and Signature
-
Auditor Name and Signature