Information
-
Removal Contractor
-
Client
-
Site Address
-
Conducted on
-
Description of works being undertaken / project
Preliminaries and Site Documentation
-
Is the method statement suitable and sufficient ?
-
Have any amendments been made and are these justified ?
-
Have works been set up as per the original drawings and if not are the changes justified ?
-
Is the name of the UKAS lab and any planned air monitoring arrangements detailed in the plan of work ?
-
Is there a set of risk assessments on site and available for inspection for activities other than asbestos removal? (hot work, working at height, hand tools etc) and is it adequete ?
-
Is there a set of COSHH assessments on site?
-
Is there an in date ASB5 on site and is this document suffice and match the works on site ?
-
Are there any changes to the ASB5 and is corresponding evidence on site of the changes ?
-
If any of work is non notifiable should it have been NNL work ?
-
If the work is NNLW is the notification form on site and adequete ?
-
Is a copy of their valid asbestos license on site ?
-
Is a copy of their valid public indemnity insurance on site ?
-
Is a copy of their Waste carriers license on site ?
-
Is the supervisors site diary/checks completed ?
-
Are any relevant isolations available for inspection ?
Training Certificates
-
Supervisor
-
Current valid medical certificate ?
-
Current Training Certificate ?
-
Annual service for Full Face RPE ?
-
Face Fit Tests Cert for RPE ?
-
Inspection record for RPE?
-
Emergency Procedure Awareness?
-
Clean Shaven ?
-
Other relevant training like work at Height / Confined Spaces ?
-
Are the training records verified by the company ?
-
Operatives
-
Current Medical Certificates ?
-
Current Training Certificates ?
-
Face Fit Test Cert for RPE ?
-
Inspection record of RPE?
-
Emergency Procedure Awareness?
-
Annual Service for Full Face RPE ?
-
Clean Shaven ?
-
Other relevant training like work at height / Confined Spaces ?
-
Are training records verified by the company ?
Plant on site
-
Do the number of H type vacuums on site correspond with the method statement? Note 2 minimum for licensed work needed.
-
Are current DOP test certificates (or copies) available and relevant to each NPU or Vaccum on site?
-
Does to number and capacity of the NPU's in use correspond with that stated in the plan of work?
-
Are leads PAT tested and clear of tape and damage ?
Enclosure / Airlocks
-
Is the enclosure integrity in sound condition and constructed as to prevent the spread of asbestos?
-
For Non notifiable or NNL works is the work area segregated adequetly dependant on the material with warning signs ?
-
Are the enclosure inspection and smoke test records available for inspection?
-
Are there adequate warning signs which comply with the signs and signal regs?
-
Is the airlock free from visible asbestos debris?
-
Is a H Vac , bucket and sponge or similar available for preliminary decontamination ?
-
Are the airlock openings either oval or rectangular in shape and robust ?
-
Do the flaps cover the airlock openings adequately?
-
Are all of the airlock flaps weighted?
-
Is each stage of the airlock/Baglock at least 1m x 1m x 2m (height) where space permits and If not is this justified ?
-
Is each viewing panel (where applicable) on the enclosure at least 600mm x 300mm
-
Does the airlock / Baglock have viewing panels at least 600 x 300mm?
-
Is there a suitably stocked first aid kit and fire extinguisher by the airlock ?
Air Extraction Equipment
-
Is the extract sited in relation to ideal air management?
-
Is the extraction equipment achieving at least a minimum of 8 air changes per hour?
-
Is the extract vented to outside atmosphere where practical if not is air monitoring being carried out ?
-
Are NPU air velocity readings being recorded by the supervisor ?
Observed Work Practices
-
Does the area have viewing panels and/or CCTV as per the method statement and does it allow inspection of the work area as far as reasonably practical ?
-
Is the area adequetly lit ?
-
Is the pre-filter the only part of the NPU exposed to the working area? (ie NPU sheeted out if inside enclosure)
-
RPE and filter used as stated in plan of work? (ie suitable)
-
RPE identifiable as a complete kit? (i.e mask, blower, and battery all uniquely identified as one kit)
-
Are colours of coveralls as stated in the plan of work or standard procedures?
-
Are all items of necessary PPE being properly worn? (e.g overall hood over head straps, overalls not tucked into boots etc)
-
Does the dust suppression method being used match that stated in the plan of work?
-
Is the dust suppression method suitable for the type of work or material? (if needle injection machine being used, please state manufacturer)
-
Does the asbestos removal technique being used match that stated in the plan of work?
-
Has the waste been appropriately bagged? (e.g immediately and single bagged if still in enclosure)
-
Is access equipment being used correctly ?
Hygiene Facility
-
Is the unit positioned in relation to the work area as stated in the plan of work?
-
If the unit is not directly connected to the enclosure, would it have been reasonably practicable to do so?
-
If the unit is directly connected is it set up as per HSG 247 / Standard Operating Proceedures with an air inlet point ?
-
Is the transit route as short as possible and away from occupied areas?
-
Is the unit functional/in working order? (level ,water, ventilation, heating, lighting, water filter,foul drains etc)
-
Are the internal doors and external door to the dirty end all fully self closing?
-
Is there an adequate number of showerheads for operatives?(i.e at least one for every 4 operatives)
-
Is there a nailbrush provided in the shower area?
-
Is the unit is good condition and clean so far as is reasonably practicable?
-
Is there a clearance test certificate from the previous job ?
-
Are the clean end and dirty end doors marked (including prohibited entry and mandatory PPE signage where required)?
-
Are towels provided?
-
Has the DCU had its Gas, Electrics and NPU tested and in these items in date regards servicing ?
Waste
-
Are the waste disposal arrangements as described in the plan of work and are they suitable ?
-
Has a separate baglock been provided, if not could it have ?
-
Are the baglock and waste routes , Skip/Waste Van visible clean ?
Non Asbestos Hazard's
MEWPS
-
Has the Work area / Terrain / Weather been assessed correctly for the use of the MEWP ?
-
Has the equipment been inspected in the past 6 months and is the certificate on site ?
-
Are all operator using the equipment trainied in its use I.e IPAF and is PPE being used where applicable ?
Fixed Scaffolding
-
Has a documentated inspection including scaff tag been carried out on the scaffold to include <br>Before Use<br>After substantial alterations<br>Weather in a 7 day period ?
-
If fixed scaffolding has been used should this have been a licensed scaffolder if already not ?
Mobile Scaffolding
-
Have competent personel erected and inspected the scaffold ?
Noise and vibration
-
Is exposure to noise and vibration being monitored where applicable and is there signage in place ?
-
Is the correct PPE being worn for noise and vibration ?
-
Is the noise and vibration adequetly controlled in the method statement eg tools identified, EAV/ LEV, rotation and PPE etc.
Work at Height
-
Are suitable control measures in place ?
Work at elevated temperatures / Hot Works
-
Are all control measures in place including communication, fire suppressants, rescue equipment and gas testing etc.
-
Are proceedures in place to deal with emergencies ?
Confined Spaces
-
Has the RAMS adequately controlled any working at elevated temperatures to include:<br>Reducing temp at source<br>Increase air flow<br>RPE/PPE<br>Rotation/Restricted work regimes<br>Medicals and surveillance<br>Decontamination nand isotonic fluids<br>Permit to work<br>Temperature readings
-
Have risks of fire been reduced and are arrangements in place to deal with any fires / Emergencies ?
-
Have all persons involved in confined space work received the correct level of confined space training ?
Direct Pressure Blasting
-
Has the equipment been set up correctly and is the device being used safely ?
-
Have all users been trained to use the equipment ?
Further Comments / Observations / Workforce Feedback
-
Additional comments
-
Actions required
-
Auditors Name