Information

  • Audit No

  • Analyst

  • Project Manager

  • Reason for Audit

  • Are they now authorised ?

  • Number of Non Compliances

  • Date of Audit

  • Client

  • Site Address

  • Job Number

  • Location and description of works ( material )

Project Manager - Contract review and planning

  • Has the method statement been completed and is the scope of works correct ?

  • Have all forseable hazards been identified and control measures put in place ? If NCR Raised see below

  • If part of a large project was a site visit conducted ?

  • If a site visit wasnt conducted has a desk top study been completed instead ?

  • Has the project manager used the correct latest controlled documents ? Please note them

  • Where the work is project managed has the analyst been provided with all relevant required information like the the latest survey/re-inspection information/Specification ?

  • Where the work is being project managed is the type of works suitably planned and in line with current regulations and guidance ?

  • Is the analyst suitably trained/experienced for the tasks undertaken ? Auditor to only authorise staff with appropriate experience and training

Analyst - Health&Safety , Quality , Equipment and Laboratory

  • Has the analyst reviewed their method statement and dynamic risk assessment and signed / understood it ?

  • Has the analyst identified any unforseen hazards and addressed these issues with the LARC/PM ?

  • Are COSHH assessments available ?

  • Has the analyst filled in his monthly exposure sheet and equipment records and are they up to date ?

  • Is all required PPE on site ie Hard hats ,Boots, Gloves, HI Viz jacket, goggles ear defenders and disposable overalls and booties if required ?

  • Is the RPE being used in good condition, complete , clean and suitably identified as the analysts mask ? Is the surveyor clean shaven and can demonstrate a good face fit ?

  • Is the analyst up to date with his their monthly QC's

  • Is the kit list complete and compliant ?

  • Are filters being used Media/Lab blanked ? Record details/results

  • Are calibration graphs available for the flow meters ?

  • Does the surveyor have copies of all relevant training /guidence records available and are they in date ? P Certs ,CSCS ,face fits and WAH etc

  • Is there an adequate number of calibrated pumps and their chargers available ?

  • Has equipment been PAT tested in past 12 months ? Is equipment and cabling in good condition

  • Is there adequate number of cowls and caps present and are they clearly identified ?

  • Is there a calibrated personal pump and a charger available on site?

  • Sufficient clean acetone and triacetate available ?

  • Is there a Vaporiser present ?

  • Tweezers and syringes present ?

  • Adequate amount of slides and cover slips ?

  • Lens tissues and wet wipes available ?

  • Chisel or Screwdriver, torch with spare batteries and a mirror available ?

  • Sample bags available ?

  • Spare fuses and bulbs available ?

  • Microscope being used suffice and in service date? What is the ref number & the next service date?

  • Central telescope present ?

  • Stage micrometer being used and in calibration ? What is the ref number & the next calibration date ?

  • NPL test slide being used and in calibration ? What is the red number & the next calibration date?

  • Watch and barometer number used and in calibration ? What is the ref number & the next calibration date?

  • High Flow meter used and in calibration ? What is the ref number and next calibration date ?

  • Low flow meter used and in calibration ? What is the ref number and next calibration date ?

  • That months slide box at hand and in order ? Check all monthly slide boxes in possession and the record details if possible

  • Does the analyst use a lab van and if so does the lab van comply with the quality manual i.e Fire extinguisher and bulkhead etc ?

  • Is the lab area suitable and clean ?

  • Has a lab air test been conducted where required ?

Analyst - Certificate Of Reoccupation Assessment

  • Stage 1 - Has the analyst reviewed the contractors method statement and understood it ?

  • Stage 1 - Has the analyst produced an accurate plan and has it been signed by the supervisor to agree the work ?

  • Stage 1 - Has the analyst checked the DCU and is it set up correctly ?

  • Stage 1 - Has the skip or waste area, applicable waste / transit routes and the immediate surrounding area to the enclosure been checked correctly and free from obvious asbestos debris and waste ?

  • Stage 1 - Has the enclosure integrity been checked and is the NPU intact and running ?

  • Stage 1 - Has viewing of the work area via the viewing panel / CCTV been carried out and any potential issues addressed ?

  • Stage 1 - Has the analyst used the DCU to enter the enclosure ?

  • Stage 2 - Is the enclosure dry ? Note how the analyst/contractor adresses such issues

  • Stage 2 - Has the analyst undertaken an initial inspection of the work area to confirm the fine clean has been completed and the visual can begin ?

  • Stage 2 - Has the analyst taken in a mirror , torch and screwdriver into the work area for the visual ?

  • Stage 2 - Was the visual inspection thorough and carried out to a satisfactory standard ?

  • Stage 2 - Was access equipment and safety gear used correctly if applicable ?

  • Stage 2 - Has the analyst decontaminated correctly upon exiting the enclosure and using the DCU ?

  • Stage 2 - Did the analyst instruct the operatives / supervisor correctly on any remedial actions ?

  • Stage 2 - Have all remaining work tools been removed / & vacuum ends tape sealed ?

  • Stage 2 - Were any potential remaining ACM'S identified and left in good condition or encapsulated depending on the material ?

  • Stage 3 - Has the NPU filter been replaced ,NPU turned off and capped ? Note if remaining on and state reason why

  • Stage 3 - Has the analyst conducted a field blank ? If counted record result

  • Stage 3 - Has the analyst used the correct number of air tests for the size of the enclosure ? Record the volume and number of samples used

  • Stage 3 - Has the set up of the pumps been correct and all details recorded correctly ?

  • Stage 3 - Has disturbed air testing been carried out correctly with a brush and for a minimum of 1.5 mind per pump ?

  • Stage 3 - Can the analyst demonstrate the set up of the microscope correctly ?

  • Stage 3 - Has decontamination and the retrieval process of the pumps from the work area been carried out details recorded correctly ?

  • Stage 3 - Was filter preparation and slide mounting suitable ?

  • Stage 3 - Where witnessed was slide counting conducted suitably as per HSG248

  • Stage 4 - Has the analyst monitered dismantling of the enclosure to check if dust and debris have been released ?

  • Stage 4 - Has the analyst carried out a reassurance air test where there is justification to do so ?

  • Stage 4 - Has any known/potential asbestos been uncovered and been dealt with correctly ?

  • Stage 4 - Has the analyst carried out a thorough inspection of the former work area and it's associated routes to ensure no debris , waste, equipment or former enclosure materials remain ?

  • Completed Paperwork - Has the analyst completed all the paperwork accurately / correctly and has a removal contractor representative signed the paperwork ?

  • Decontamination Unit Assessment - Has the analyst worn the correct RPE and PPE for the clearance ?

  • Decontamination Unit Assessment - Has the visual been satisfactory ?

  • Decontamination Unit Assessment - Has the air test proceedure been conducted satisfactory ?

  • Decontamination Unit Assessment - Has the analyst conducted a disturbed air test ?

Summary

  • Please summarise the audit and give any recommendations moving forward.

Project Managers Result

  • Score

  • Audit Result - Satisfactory or Non Satisfactory

Analyst Result

  • Score

  • Audit Result - Satisfactory or Non Satisfactory

  • Analysts Name and Signature

  • Auditor Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.