Information

  • Audit Title

  • Audit No

  • Analyst

  • Project Manager

  • Reason for Audit

  • Are they now authorised ?

  • Number of Non Compliances

  • Date of Audit

  • Client

  • Site Address

  • Job Number

  • Location and description of works ( material )

Project Manager - Contract review and planning

  • Has the job number been set up on Tracker correctly ?

  • Are details found in the method statement correct regards the outlined scope of works and requirements for the client ?

  • Has a method statement and risk assessment been accurately completed and signed by the PM?

  • Has all paperwork used by the project manager the latest controlled documents ? Please state them

  • Where the work is project managed has the analyst been provided with all relevant required information like the the latest survey/re-inspection information/Specification ?

  • Where the work is being project managed is the type of works suitably planned and in line with current regulations and guidance ?

  • Is the analyst suitably trained for the tasks undertaken ? Auditor to only authorise staff with appropriate experience and training

Analyst - Health and Safety and Quality Control

  • Is all required PPE on site ie Hard hats ,Boots, Gloves, HI Viz jacket, goggles ear defenders and disposable overalls and booties if required ?

  • Is the RPE being used in good condition, complete , clean and suitably identified as the analysts mask ? Is the surveyor clean shaven and can demonstrate a good face fit ?

  • Has the analyst filled in his monthly exposure sheet and equipment records and are they up to date ?

  • Is there a copy of the Quality manual, M&S guidance and Hsg 248 & 247 available ?

  • Is the analyst up to date with his their monthly QC's

  • Are filters being used Media/Lab blanked ? Record details/results

  • Are calibration graphs available for the flow meters ?

  • Does the surveyor have copies of all relevant training records available and are they in date ? P Certs ,CSCS ,face fits and WAH etc

  • Are COSHH assessments available ?

  • Has the analyst reviewed their method statement and risk assessment and signed / understood it ?

Analyst - Equipment and Laboratory

  • Is there an adequate number of calibrated pumps and their chargers available ?

  • Has equipment been PAT tested in past 12 months ? Are all cables in good condition and free of tape marks

  • Is there adequate number of cowls and caps present and are they clearly identified ?

  • Is there a calibrated personal pump and a charger available on site?

  • Sufficient clean acetone and triacetate available ?

  • Is there a Vaporiser present ?

  • Tweezers and syringes present ?

  • Adequate amount of slides and cover slips ?

  • Lens tissues and wet wipes available ?

  • Chisel or Screwdriver, torch with spare batteries and a mirror available ?

  • Sample bags available ?

  • Spare fuses and bulbs available ?

  • Microscope being used suffice ? What is the ref number & the next service date?

  • Central telescope present ?

  • Stage micrometer being used ? What is the ref number & the next calibration date ?

  • NPL test slide being used ? What is the red number & the next calibration date?

  • Watch and barometer number used ? What is the ref number & the next calibration date?

  • High Flow meter used ? What is the ref number and next calibration date ?

  • Low flow meter used ? What is the ref number and next calibration date ?

  • That months slide box at hand and in order ? Check all monthly slide boxes in possession and the record details if possible

  • Does the analyst use a lab van and if so does the lab van comply with the quality manual i.e Fire extinguisher and bulkhead etc ?

  • Is the lab area suitable and clean ?

  • Has a lab air test been conducted where required ?

Analyst - Reoccupation Certificate Stage 1

  • Has the analyst reviewed the contractors method statement and understood it ?

  • Has the analyst produced an accurate plan and has it been signed by the supervisor to agree the work ?

  • Has the analyst checked the DCU and is it set up correctly ?

  • Has the skip or waste area, applicable waste / transit routes and the immediate surrounding area to the enclosure been checked correctly and free from obvious asbestos debris and waste ?

  • Has the enclosure integrity been checked and is the NPU intact and running ?

  • Has viewing of the work area via the viewing panel / CCTV been carried out and any potential issues addressed ?

  • Has the analyst filled in stage 1 paperwork correctly ?

  • Has the analyst used the DCU to enter the enclosure ?

Analyst - Reoccupation Certificate Stage 2

  • Has the analyst taken in a mirror , torch and screw driver into the work area for the visual ?

  • Had the analyst done an initial inspection of the work area to confirm the visual can be adequately be carried out ?

  • Is the enclosure dry ?

  • Was the visual thorough and carried out to a satisfactory standard ?

  • Did the analyst use access equipment correctly ?

  • Did the analyst instruct the contractors / supervisor correctly on an remedial actions ?

  • Was any remaining ACMS identified and where applicable suitably encapsulated ?

  • Has all generated waste and work tools been removed from the work area ?

  • Has decontamination been carried out correctly ?

  • Has the paperwork for stage 2 been completed correctly ?

Analyst - Reoccupation Certificate Stage 3

  • Has the NPU been turned off where applicable and capped ?

  • Has a field blank been conducted , if counted please record result ?

  • Has the analyst used the correct number of air tests for the size of the enclosure ? Record number used and volume of area

  • Has the set up of the pumps been correct and all details recorded correctly ?

  • Has disturbed air testing been carried out correctly with a brush and for a minimum of 1.5 mins per pump ?

  • Has the retrieval process of pumps from the work area been carried out correctly and details recorded correctly ?

  • Was decontamination carried out satisfactory ?

  • Can the Analyst demonstrate the setup of the microscope correctly ?

  • Was filter preparation and slide mounting suitable ?

  • Where witnessed was counting conducted suitably as per HSG 248 ?

  • Has Stage 3 paperwork been filled in correctly ?

Analyst - Reoccupation Certificate Stage 4

  • Has the analyst watched parts of stage 4 to monitor if there has been dust and debris released during de-sheeting ?

  • Has the analyst run a reassurance where there is justification to do so ?

  • Has the analyst carried out a thorough inspection of the former work area and its associated routes to ensure no debris ,waste , equipment or former enclosure materials remain ?

  • Has any known asbestos or further uncovered potential asbestos been uncovered and been dealt with correctly ?

  • Has the paperwork been completed correctly for stage 4 and signed by the removal contractor representative?

Analyst - DCU Clearance

  • Has the analyst worn the correct RPE and PPE for the clearance ?

  • Has the visual been satisfactory ?

  • Has the air test been conducted correctly ?

  • Was a disturbance done for the air test and how ?

  • Was the paperwork completed for the DCU correctly ?

Summary

  • Please summarise the audit and give any recommendations moving forward.

Project Managers Result

  • Score

  • Audit Result - Satisfactory or Non Satisfactory

Analyst Result

  • Score

  • Audit Result - Satisfactory or Non Satisfactory

  • Analysts Name and Signature

  • Auditor Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.