Information
-
Audit Title
-
Audit No
-
Analyst
-
Project Manager
-
Reason for Audit
-
Are they now authorised ?
-
Number of Non Compliances
-
Date of Audit
-
Client
-
Site Address
-
Job Number
-
Location and description of works ( material )
Project Manager - Contract review and planning
-
Has the job number been set up on Tracker correctly ?
-
Are details found in the method statement correct regards the outlined scope of works and requirements for the client ?
-
Has a method statement and risk assessment been accurately completed and signed by the PM?
-
Has all paperwork used by the project manager the latest controlled documents ? Please state them
-
Where the work is project managed has the analyst been provided with all relevant required information like the the latest survey/re-inspection information/Specification ?
-
Where the work is being project managed is the type of works suitably planned and in line with current regulations and guidance ?
-
Is the analyst suitably trained for the tasks undertaken ? Auditor to only authorise staff with appropriate experience and training
Analyst - Health and Safety and Quality Control
-
Is all required PPE on site ie Hard hats ,Boots, Gloves, HI Viz jacket, goggles ear defenders and disposable overalls and booties if required ?
-
Is the RPE being used in good condition, complete , clean and suitably identified as the analysts mask ? Is the surveyor clean shaven and can demonstrate a good face fit ?
-
Has the analyst filled in his monthly exposure sheet and equipment records and are they up to date ?
-
Is there a copy of the Quality manual, M&S guidance and Hsg 248 & 247 available ?
-
Is the analyst up to date with his their monthly QC's
-
Are filters being used Media/Lab blanked ? Record details/results
-
Are calibration graphs available for the flow meters ?
-
Does the surveyor have copies of all relevant training records available and are they in date ? P Certs ,CSCS ,face fits and WAH etc
-
Are COSHH assessments available ?
-
Has the analyst reviewed their method statement and risk assessment and signed / understood it ?
Analyst - Equipment and Laboratory
-
Is there an adequate number of calibrated pumps and their chargers available ?
-
Has equipment been PAT tested in past 12 months ? Are all cables in good condition and free of tape marks
-
Is there adequate number of cowls and caps present and are they clearly identified ?
-
Is there a calibrated personal pump and a charger available on site?
-
Sufficient clean acetone and triacetate available ?
-
Is there a Vaporiser present ?
-
Tweezers and syringes present ?
-
Adequate amount of slides and cover slips ?
-
Lens tissues and wet wipes available ?
-
Chisel or Screwdriver, torch with spare batteries and a mirror available ?
-
Sample bags available ?
-
Spare fuses and bulbs available ?
-
Microscope being used suffice ? What is the ref number & the next service date?
-
Central telescope present ?
-
Stage micrometer being used ? What is the ref number & the next calibration date ?
-
NPL test slide being used ? What is the red number & the next calibration date?
-
Watch and barometer number used ? What is the ref number & the next calibration date?
-
High Flow meter used ? What is the ref number and next calibration date ?
-
Low flow meter used ? What is the ref number and next calibration date ?
-
That months slide box at hand and in order ? Check all monthly slide boxes in possession and the record details if possible
-
Does the analyst use a lab van and if so does the lab van comply with the quality manual i.e Fire extinguisher and bulkhead etc ?
-
Is the lab area suitable and clean ?
-
Has a lab air test been conducted where required ?
Analyst - Reoccupation Certificate Stage 1
-
Has the analyst reviewed the contractors method statement and understood it ?
-
Has the analyst produced an accurate plan and has it been signed by the supervisor to agree the work ?
-
Has the analyst checked the DCU and is it set up correctly ?
-
Has the skip or waste area, applicable waste / transit routes and the immediate surrounding area to the enclosure been checked correctly and free from obvious asbestos debris and waste ?
-
Has the enclosure integrity been checked and is the NPU intact and running ?
-
Has viewing of the work area via the viewing panel / CCTV been carried out and any potential issues addressed ?
-
Has the analyst filled in stage 1 paperwork correctly ?
-
Has the analyst used the DCU to enter the enclosure ?
Analyst - Reoccupation Certificate Stage 2
-
Has the analyst taken in a mirror , torch and screw driver into the work area for the visual ?
-
Had the analyst done an initial inspection of the work area to confirm the visual can be adequately be carried out ?
-
Is the enclosure dry ?
-
Was the visual thorough and carried out to a satisfactory standard ?
-
Did the analyst use access equipment correctly ?
-
Did the analyst instruct the contractors / supervisor correctly on an remedial actions ?
-
Was any remaining ACMS identified and where applicable suitably encapsulated ?
-
Has all generated waste and work tools been removed from the work area ?
-
Has decontamination been carried out correctly ?
-
Has the paperwork for stage 2 been completed correctly ?
Analyst - Reoccupation Certificate Stage 3
-
Has the NPU been turned off where applicable and capped ?
-
Has a field blank been conducted , if counted please record result ?
-
Has the analyst used the correct number of air tests for the size of the enclosure ? Record number used and volume of area
-
Has the set up of the pumps been correct and all details recorded correctly ?
-
Has disturbed air testing been carried out correctly with a brush and for a minimum of 1.5 mins per pump ?
-
Has the retrieval process of pumps from the work area been carried out correctly and details recorded correctly ?
-
Was decontamination carried out satisfactory ?
-
Can the Analyst demonstrate the setup of the microscope correctly ?
-
Was filter preparation and slide mounting suitable ?
-
Where witnessed was counting conducted suitably as per HSG 248 ?
-
Has Stage 3 paperwork been filled in correctly ?
Analyst - Reoccupation Certificate Stage 4
-
Has the analyst watched parts of stage 4 to monitor if there has been dust and debris released during de-sheeting ?
-
Has the analyst run a reassurance where there is justification to do so ?
-
Has the analyst carried out a thorough inspection of the former work area and its associated routes to ensure no debris ,waste , equipment or former enclosure materials remain ?
-
Has any known asbestos or further uncovered potential asbestos been uncovered and been dealt with correctly ?
-
Has the paperwork been completed correctly for stage 4 and signed by the removal contractor representative?
Analyst - DCU Clearance
-
Has the analyst worn the correct RPE and PPE for the clearance ?
-
Has the visual been satisfactory ?
-
Has the air test been conducted correctly ?
-
Was a disturbance done for the air test and how ?
-
Was the paperwork completed for the DCU correctly ?
Summary
-
Please summarise the audit and give any recommendations moving forward.
Project Managers Result
-
Score
-
Audit Result - Satisfactory or Non Satisfactory
Analyst Result
-
Score
-
Audit Result - Satisfactory or Non Satisfactory
-
Analysts Name and Signature
-
Auditor Name and Signature