Information
-
Audit No
-
Analyst
-
Reason for Audit
-
Number of Non Compliances
-
Date of Audit
-
Client
-
Site Address
-
Job Number
-
Location and description of works ( material )
Analyst - Reoccupation Certificate Stage 1
-
Has the analyst reviewed the contractors method statement and understood it ?
-
Has the analyst conducted a suitable risk assessment before proceeding ?
-
Has the analyst produced an accurate plan and has it been signed by the supervisor to agree the work ? Ensure plans meet guidance in HSG248
-
Has the analyst checked the DCU and is it set up correctly ?
-
Has the skip or waste area, applicable waste / transit routes and the immediate surrounding area to the enclosure been checked correctly and free from obvious asbestos debris and waste ?
-
Has the enclosure integrity been checked and is the NPU intact and running ?
-
Has viewing of the work area via the viewing panel / CCTV been carried out and any potential issues addressed ?
-
Has the analyst filled in stage 1 paperwork correctly ?
-
Has the analyst used the DCU to enter the enclosure ?
Analyst - Reoccupation Certificate Stage 2
-
Has the analyst taken in a mirror , torch and screw driver into the work area for the visual ?
-
Had the analyst done an initial inspection of the work area to confirm the visual can be adequately be carried out ?
-
Is the enclosure dry ?
-
Was the visual thorough and carried out to a satisfactory standard ?
-
Did the analyst use access equipment correctly ?
-
Did the analyst instruct the contractors / supervisor correctly on an remedial actions ?
-
Was any remaining ACMS identified and where applicable suitably encapsulated ?
-
Has all generated waste and work tools been removed from the work area ?
-
Has decontamination been carried out correctly ?
-
Has the paperwork for stage 2 been completed correctly ?
Analyst - Reoccupation Certificate Stage 3
-
Has the NPU been turned off where applicable and capped ?
-
Has a field blank been conducted , if counted please record result ?
-
Has the analyst used the correct number of air tests for the size of the enclosure ? Record number used and volume of area
-
Has the set up of the pumps been correct and all details recorded correctly ?
-
Has disturbed air testing been carried out correctly with a brush and for a minimum of 1.5 mins per pump ?
-
Has the retrieval process of pumps from the work area been carried out correctly and details recorded correctly ?
-
Was decontamination carried out satisfactory ?
-
Can the Analyst demonstrate the setup of the microscope correctly ?
-
Was filter preparation and slide mounting suitable ?
-
Where witnessed was counting conducted suitably as per HSG 248 ?
-
Has Stage 3 paperwork been filled in correctly ?
Analyst - Reoccupation Certificate Stage 4
-
Has the analyst watched parts of stage 4 to monitor if there has been dust and debris released during de-sheeting ?
-
Has the analyst run a reassurance where there is justification to do so ?
-
Has the analyst carried out a thorough inspection of the former work area and its associated routes to ensure no debris ,waste , equipment or former enclosure materials remain ?
-
Has any known asbestos or further uncovered potential asbestos been uncovered and been dealt with correctly ?
-
Has the paperwork been completed correctly for stage 4 and signed by the removal contractor representative?
Analyst - DCU Clearance
-
Has the analyst worn the correct RPE and PPE for the clearance ?
-
Has the visual been satisfactory ?
-
Has the air test been conducted correctly ?
-
Was a disturbance done for the air test and how ?
-
Was the paperwork completed for the DCU correctly ?
Summary
-
Please summarise the audit and give any recommendations moving forward.
Analyst Result
-
Audit Result - Satisfactory or Non Satisfactory
-
Score
-
Analysts Name and Signature
-
Assessor Name and Signature