Title Page

  • Conducted on

  • Prepared by

  • Location
  • Management control. <br>AP insurances displayed. <br>H+S law poster displayed. <br>Site inspection registers

  • Construction Phase Plan. <br>Is it available and up to date

  • Induction and training. <br>Evidence that inductions are being undertaken. <br>Evidence that training records are being held and checked

  • RAMS. <br>Risk assessment and method statements for the works being undertaken

  • Permit to Work. <br>Being issued for the works and being completed in full and signed off

  • Site surveys. <br>Evidence that these are in place

  • Site records. <br>LOLER thorough examination records in place and being kept up to date. <br>HAV and Noise levels being monitored. <br>Plant and inspection records being completed

  • Temporary Works. <br>Temporary works identified, inspected and recorded

  • Asbestos. <br>All asbestos works controlled. <br>Daily inspections required PTW04

  • First Aid. <br>First aid kits in place and checked. <br>Eye wash stations

  • Fire Risk Management. <br>Hot works permits being used. <br>Fire management in place

  • Electricity. <br>110v in use where possible. <br>Evidence of PA Testing

  • Environmental Considerations. <br>Spill kits and drip trays in use. <br>Concrete wash out facilities. <br>Good house keeping

  • Compressors. <br>Whip checks in use. <br>Compressor suitable sited

  • COSHH. <br>COSHH Assessments available for the substances on site. <br>Dust suppression in use. <br>Suitable filters on plant exhausts. <br>Good general practice

  • Excavations. <br>Services checked and marked on drawings. <br>Work in accordance PTD (PTW01). <br>Safe edge protection. <br>Evidence of daily inspections

  • Confined Space (underpinning bases >2m). <br>Safe access. <br>Gas monitoring. <br>Emergency procedures in place. <br>Underpinning based tagging system in place

  • Piling Operations. <br>Services checked and marked on drawings. <br>Working in accordance with PTD (PTW01).

  • Unguarded operation of the piling rig. <br>Danger zone secured. <br>Work in accordance with PTW03. <br>Unguarded piles identified in drawing.

  • Lifting operations. <br>LOLER inspections being undertaken. <br>SWL marked on equipment. <br>Suitable lifting equipment and accessories in use

  • Manual Handling. <br>Good manual handling practices

  • PPE. <br>Correct PPE in use

  • Plant, Tools and Equipment. <br>Guards in use. <br>All safety features in place and working. <br>Tools being stored properly

  • Site Safety and Security. <br>Public safety precautions in place. <br>Site and work areas secured and segregated. <br>Signage in place

  • Traffic Management. <br>Traffic management plan in place and in use. <br>Banksmen in use

  • Welfare Management. <br>Meet with the requirements of CDM. <br>In good condition and kept in good order

  • Working at Height. <br>Edge protection in place. <br>No unsafe areas seen

  • Site Visit. <br>Crew have a positive attitude. <br>Notice left on site.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.