Title Page
-
Store name and number
-
Work Order Number
-
Conducted on
-
Prepared by
Equipment
-
Has your leak detector been calibrated in the last 6 weeks
-
Contact manager engineer to test equipment
Leak Test
-
Has all accessible edquipment and pipework leak tested
-
Were any leaks found
-
Please list leaks and repairs carried out
-
Please arrange to complete the test
Future Leak Prevention
-
Is plant area clean and tidy so that evidence of future leaks become apparent.
-
Does all accessible pipework appear to be in good condition.
-
Please provide Photograph and advise managing engineer
-
Check all flexible hoses/pressure switch couplers
-
Are all hoses in good condition? with no signs of rubbing or deterioration
-
Please replace any damaged/degraded hoses if not please contact managing engineer to arrange replacement
-
Please complete check
-
Is there any noticable vibration that can be reduced? i.e anti vibration mounts released/replaced, inverter frequency skipped setpoints adjusted etc
-
how was this done
-
Contact Managing engineer to discuss possible solutions
-
Are all compressor mounts in good condition
-
Contact Managing engineer to discuss possible solutions
-
Are all pipeclamps fitted correctly and in good condition
-
Are there any Danfoss GVC valves onsite?
-
Please provide details for managing engineer to arrange replacement
-
contact managing engineer for advice.
-
Is there anything else onsite that you feel could cause future leaks?
-
Please list issues and contact advise managing engineer
-
Are all PRV's in date