Title Page
-
Job Name & Number
-
Conducted on
-
Prepared by
-
Location
LV Pillar Inspection
- LV Pillar Inspection
-
Start Inspection
-
Boundry Peg in Place
-
Photo of Boundry Peg in correct location
-
Cable backfilled with sand
-
Cables terminate as they lay in trench, cables are not to be crossed
-
Cables Rectified before termination
-
Kerb Installed and Ground Level Known
-
Contact Site Manager and Obtain Ground Level height
-
Photo of GL provided
-
Service Lead Ins Place
-
Set Base as per
-
Confirm line on base matches GL
-
Photo of Base
-
Confirm line on base matches GL
-
Photo of Base
-
Confirm Neutral Termination is on Road Side
-
Confirm Phase Sequence is Neutral Red White Blue
-
Torque all bolts as per Instructions
-
Confirm no exposed conductor visible
-
Photo of the termination completed
-
Street Light Connection
-
Number of Connections
-
LV Pit Connection
-
Number of Connections
-
Fit Cable neutral ID tag
-
Photo of ID Tags
-
Date and Time
-
Sign Off