Title Page

  • Job Name:

  • Job Number:

  • Site Location
  • Conducted on

Control Cable Number 1

  • Start Test

  • Equipment ID

  • Cable ID

Control Cable 1 Inspection

  • Source Termination Location

  • Cable type and size

  • Earth size

  • Cable type and size complies with standards and specifications

  • Permanent cable labels attached, correct and visible

  • Cable supports installed, including mechanical protection

  • Earth (Armoring / Screen) terminations completed satisfactorily as per drawing

  • Visual Inspection of Cable (no sheath damage)

  • Cable termination’s completed satisfactorily including correct polarity

  • Core identification correct and fitted with wire number

  • Correct cable glands installed and tightened satisfactorily

  • Photos

Control Cable 1 Point to Point

  • When selecting point to point core number, IF the correct number is not shown select the higher number

  • Select Number of Point to Point Cores

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 21

  • Core 22

  • Core 23

  • Core 24

  • Core 25

  • Core 26

  • Core 27

  • Core 28

  • Core 29

  • Core 30

Control Cable 1 Tests

  • Insulation resistance Test

  • Earth continuity

  • Screen Earth continuity

Control Cable 2

  • Start Test

  • Equipment ID

  • Cable ID

Control Cable 2 Inspection

  • Source Termination Location

  • Cable type and size

  • Earth size

  • Cable type and size complies with standards and specifications

  • Permanent cable labels attached, correct and visible

  • Cable supports installed, including mechanical protection

  • Earth (Armoring / Screen) terminations completed satisfactorily as per drawing

  • Visual Inspection of Cable (no sheath damage)

  • Cable termination’s completed satisfactorily including correct polarity

  • Core identification correct and fitted with wire number

  • Correct cable glands installed and tightened satisfactorily

  • Photos

Control Cable 2 Point to Point

  • When selecting point to point core number, IF the correct number is not shown select the higher number

  • Select Number of Point to Point Cores

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 21

  • Core 22

  • Core 23

  • Core 24

  • Core 25

  • Core 26

  • Core 27

  • Core 28

  • Core 29

  • Core 30

Control Cable 2 Tests

  • Insulation resistance Test

  • Earth continuity

  • Screen Earth continuity

Control Cable 3

  • Start Test

  • Equipment ID

  • Cable ID

Control Cable 3 Inspection

  • Source Termination Location

  • Cable type and size

  • Earth size

  • Cable type and size complies with standards and specifications

  • Permanent cable labels attached, correct and visible

  • Cable supports installed, including mechanical protection

  • Earth (Armoring / Screen) terminations completed satisfactorily as per drawing

  • Visual Inspection of Cable (no sheath damage)

  • Cable termination’s completed satisfactorily including correct polarity

  • Core identification correct and fitted with wire number

  • Correct cable glands installed and tightened satisfactorily

  • Photos

Control Cable 3 Point to Point

  • When selecting point to point core number, IF the correct number is not shown select the higher number

  • Select Number of Point to Point Cores

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 21

  • Core 22

  • Core 23

  • Core 24

  • Core 25

  • Core 26

  • Core 27

  • Core 28

  • Core 29

  • Core 30

Control Cable 3 Tests

  • Insulation resistance Test

  • Earth continuity

  • Screen Earth continuity

Control Cable 4

  • Start Test

  • Equipment ID

  • Cable ID

Control Cable 4 Inspection

  • Source Termination Location

  • Cable type and size

  • Earth size

  • Cable type and size complies with standards and specifications

  • Permanent cable labels attached, correct and visible

  • Cable supports installed, including mechanical protection

  • Earth (Armoring / Screen) terminations completed satisfactorily as per drawing

  • Visual Inspection of Cable (no sheath damage)

  • Cable termination’s completed satisfactorily including correct polarity

  • Core identification correct and fitted with wire number

  • Correct cable glands installed and tightened satisfactorily

  • Photos

Control Cable 4 Point to Point

  • When selecting point to point core number, IF the correct number is not shown select the higher number

  • Select Number of Point to Point Cores

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 21

  • Core 22

  • Core 23

  • Core 24

  • Core 25

  • Core 26

  • Core 27

  • Core 28

  • Core 29

  • Core 30

Control Cable 4 Tests

  • Insulation resistance Test

  • Earth continuity

  • Screen Earth continuity

Control Cable 5

  • Start Test

  • Equipment ID

  • Cable ID

Control Cable 5 Inspection

  • Source Termination Location

  • Cable type and size

  • Earth size

  • Cable type and size complies with standards and specifications

  • Permanent cable labels attached, correct and visible

  • Cable supports installed, including mechanical protection

  • Earth (Armoring / Screen) terminations completed satisfactorily as per drawing

  • Visual Inspection of Cable (no sheath damage)

  • Cable termination’s completed satisfactorily including correct polarity

  • Core identification correct and fitted with wire number

  • Correct cable glands installed and tightened satisfactorily

  • Photos

Control Cable 5 Point to Point

  • When selecting point to point core number, IF the correct number is not shown select the higher number

  • Select Number of Point to Point Cores

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 21

  • Core 22

  • Core 23

  • Core 24

  • Core 25

  • Core 26

  • Core 27

  • Core 28

  • Core 29

  • Core 30

Control Cable 5 Tests

  • Insulation resistance Test

  • Earth continuity

  • Screen Earth continuity

Additional Control Cables

    Additional Control Cables
  • Start Test

  • Equipment ID

  • Cable ID

Control Cable Inspection

  • Source Termination Location

  • Cable type and size

  • Earth size

  • Cable type and size complies with standards and specifications

  • Permanent cable labels attached, correct and visible

  • Cable supports installed, including mechanical protection

  • Earth (Armoring / Screen) terminations completed satisfactorily as per drawing

  • Visual Inspection of Cable (no sheath damage)

  • Cable termination’s completed satisfactorily including correct polarity

  • Core identification correct and fitted with wire number

  • Correct cable glands installed and tightened satisfactorily

  • Photos

Control Cable Point to Point

  • When selecting point to point core number, IF the correct number is not shown select the higher number

  • Select Number of Point to Point Cores

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 1

  • Core 2

  • Core 3

  • Core 4

  • Core 5

  • Core 6

  • Core 7

  • Core 8

  • Core 9

  • Core 10

  • Core 11

  • Core 12

  • Core 13

  • Core 14

  • Core 15

  • Core 16

  • Core 17

  • Core 18

  • Core 19

  • Core 20

  • Core 21

  • Core 22

  • Core 23

  • Core 24

  • Core 25

  • Core 26

  • Core 27

  • Core 28

  • Core 29

  • Core 30

Control Cable Tests

  • Insulation resistance Test

  • Earth continuity

  • Screen Earth continuity

Completion

  • Remove all test lead and bridges

  • Replace covers and check all panels are closed

  • Drawings & schedules are marked up

  • Completed By

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.