Title Page
-
Project Name
-
Job Number
-
Switchboard Number
-
Date
-
Prepared by
-
Position Title
-
Location
Circuit Breaker Inspection
- Circuit Breaker Inspection - Pre-Energizations
-
Circuit Breaker ID
-
Circuit Breaker is as per OEM Drawings (part number, rating & Assembly location)
-
Take Photos to capture Manufacturer, Serial Number, Ratings (a), (kA), System Voltage
Visual & Operational Inspection
-
Circuit Breaker Labelled
-
All bolts tighten and witness marked (Line and Load side)
-
Turn the Circuit Breaker OFF
-
Pass Result: Continuity to be Open Circuit
-
Perform Continuity Test Line Side to Load Side A phase
-
Perform Continuity Test Line Side to Load Side B phase
-
Perform Continuity Test Line Side to Load Side C phase
-
Test All Phases to Earth
-
Take (1) Witness Photo
-
Turn the Circuit Breaker ON
-
Pass Result: Continuity to be closed circuit
-
Perform Continuity Test Line Side to Load Side A phase
-
Perform Continuity Test Line Side to Load Side B phase
-
Perform Continuity Test Line Side to Load Side C phase
-
Take (1) Witness Photo
-
Installations are IP2X Rating
-
Circuit Breaker handle Functional.
-
Earthing straps installed to door and pan
-
Cubical Clean and Vacuumed
-
Photo(s) of Completed Visual Inspection
Projection Settings
-
Do you have a copy of the Projection Study
-
Do not Proceed contact your Supervisor
-
Manufacture of Circuit Breaker
-
IR Setting
-
TR Setting
-
Isd Setting
-
Tsd Setting
-
Ramp
-
li Setting
-
lo Setting
-
l1 Setting
-
T1 setting
-
l2 Setting
-
T2 Setting
-
Ramp Setting
-
I3 Setting
-
Mark Up/Highlight Projection Study As Builds and Take a Photo
-
Photo(s) of the completed settings on the Circuit Breaker
-
Date works completed
Circuit Breaker Aux Trip Units - Pre Energization.
-
Note: A highlighted/Marked up As build drawing will provide the detailed supporting check off
-
Note: Continuity Tests (point to point) needs to be conducted from the PLC/RTU with CB Being Operated
-
Open (Turn Off) All Circuit Breakers - Continuity Test (point to point) at PLC
-
Close (Turn On) All Circuit Breakers - Continuity Test (point to point) at PLC
-
Trip Unit "Healthy" Normal State - Continuity Test (point to point) PLC
-
Trip Unit "Tripped" Press the "Push to Trip Button"- Continuity Test (point to point) PLC
-
Core labels are as per OEM Drawings
-
Mark Up/Highlight As Builds and Take a Photo
Report Sign Off
-
Onsite Sign Off: I am Satisfied that all the circuit breakers within this report meet the design specifications provided
-
Engineer Review: I have reviewed the circuit breakers Inspected in this report and confirm that they meet the design specifications.