Title Page
-
Job Name:
-
Job Number:
-
LOT Checklist Number
-
Site Location
-
Conducted on
-
Prepared by
-
LOT Checklist - CONDUIT INSTALLATION
SAFETY
-
Risk assessment completed
-
Has a permit to excavate been issued?
-
Photo of plans showing location
-
Lot Number
-
Type of Installation
- HV
- LV
- COMMS
-
Does the conduit size & type comply with drawings
-
Have all services been located and pot holed as required before excavation commences?
-
Has the conduit route been agreed with DPC
-
Has bedding material been placed minimum 50mm below conduit?
-
Depth from Top of Conduit (minimum 600mm cover from top of conduit)
-
Has a minimum 50mm space been maintained between conduit and wall?
-
Have all conduit joints been glued?
-
HOLD POINT - Prior to backfilling of trenches, inform client representatives<br>
-
Has bedding material been placed minimum 50mm above top of conduit?
-
HOLD POINT - Have any bends been used along the conduit run?
-
Have exposed ends been plugged to prevent ingress of dirt & moisture?
-
Have all precautions been taken to prevent any damage to conduits during backfilling?
-
Stabilized sand to be used as backfill (Road Crossing Only)
-
Clean backfill used
-
Warning Tape installed
-
Has the trench been compacted in layers
Conduit Run#
-
Number of Conduits with Description
-
Attach photos of the conduit installation. (E.G. Setout, Excavation, Bottom of trench, Conduits, Backfill/completion)
-
Has the site has been left clean and safe? Barricading installed where required?
-
If areas completed hand back permit and all docs.
-
Is there any issues ?