CBP ITC-001 - CONDUIT INSTALLATION
SAFETY
-
Risk assessment completed and start card completed
-
Has a permit to excavate been issued by CBP?
-
Has a DBYD been completed
Checklist
-
-
Photo of Navis works showing ITP location
-
Description of location
-
Conduit Installation type?
- Traffic Signal
- LV
- Street lighting
- Comms
- HV
-
Is trench for HV conduit?
-
Has 50mm concrete or PVC danger protection installed as required by the drawings?
-
Does the conduit size & type comply with drawings
-
Have all services been located and pot holed as required before excavation commences?
-
Has the conduit route been pegged by the Surveyor?
-
Have finished levels been provided on the conduit route pegs?
-
Has the conduit alignment and depth been clash detected and modelled?
-
Photographs of set out
-
Has depth been checked to match model? Photo showing depth
-
HOLD POINT - Prior to backfilling of trenches, has the conduit system has been inspected by the CPB Rep?
-
HOLD POINT - Prior to backfilling of trenches , has the conduit points been Surveyed
-
Have all conduit joints been glued?
-
HOLD POINT - Have any bends been used along the conduit run?
-
Degree and QTY
- 150mm HD 22d
- 150mm HD 33d
- 150mm HD 45d
- 150mm HD 90d
- 125mm HD 22d
- 125mm HD 33d
- 125mm HD 45d
- 125mm HD 90d
- 100mm HD 22d
- 100mm HD 33d
- 100mm HD 45d
- 100mm HD 90d
- 80mm HD 45d
- 80mm HD 90d
- 63mm HD 90d
- 50mm HD 90d
- 40mm HD 90d
- 32mm HD 90d
- 50mm Comms HD 90d
- 100mm Comms HD 22d
- 100mm Comms HD 33d
- 100mm Comms HD 45d
- 100mm Comms HD 90d
-
Have exposed ends been plugged to prevent ingress of dirt & moisture?
-
Have all precautions been taken to prevent any damage to conduits during backfilling?
-
Is the area in the danger zone?
-
Stabilized sand to be used as backfill
-
Clean backfill used
-
Has the trench compaction been tested?
Conduit Run #
-
Conduits area
-
Trench detail
-
Attach photos of the conduit installation. (E.G. Setout, Excavation, Bottom of trench, Conduits, Backfill/completion)
-
Has the site has been left clean and safe? Barricading installed where required?
-
If areas completed hand back permit and all docs.
-
Is there any issues ?