Title Page
-
Job Name:
-
Job Number:
-
LOT Checklist Number
-
Site Location
-
Conducted on
-
Prepared by
-
LOT Checklist - PIT INSTALLATION
SAFETY
-
Risk assessment done
-
Has a permit to excavate been issued?
-
Photo of plans showing ITC location
-
Pit Number
-
Pit Installation type?
-
Pit Size
-
Has the Pit location been agreed with DPC
-
Has a layer of Concrete poured as base to house the Pit
-
Is there a drain installed
-
Have you installed 50mm of bedding material below pit?
-
Bellmouths have these been installed?
-
Check pit for level and finished height
-
HOLD POINT - Prior to backfilling of pits, inform DPC<br>
-
Has any Riser been used, if yes provide details
-
Have exposed ends been plugged to prevent ingress of dirt & moisture?
-
Have all precautions been taken to prevent any damage to conduits during backfilling?
-
Has the Pit been covered using a Class B/D Lid?
PIT #
-
Attach photos of the pit installation. (E.G. Setout, Excavation, Bottom of pit, pit, Backfill/completion)
-
Has the site been left clean and safe? Barricading installed where required?
-
If areas completed hand back permit and all docs.
-
Is there any issues ?