Title Page
-
Job Name & Number
-
Conducted on
-
Prepared by
-
Location
LV Pit Inspection
- Pit Inspection
-
Start Inspection
-
Boundary Peg in Place
-
Photo of the boundary peg in correct location
-
Cable backfilled with Sand
-
Cables terminate as they lay in trench, cables are not to be crossed
-
Cables Rectified before termination
-
Kerb Installed & Ground Line Known
-
Contact Site Manager to obtain Ground Level
-
Photo of GL provided
-
Service Leads in Place
-
Pit Set to height and backfilled with Sand
-
Termination into 4way connections
-
Tug Test
-
Street Light Connection
-
Fit Cable neutral ID tag
-
Photo of ID Tags
-
Date and time
-
Sign off