Title Page

  • Job Name & Number

  • Conducted on

  • Prepared by

  • Location

LV Pit Inspection

    Pit Inspection
  • Start Inspection

  • Boundary Peg in Place

  • Photo of the boundary peg in correct location

  • Cable backfilled with Sand

  • Cables terminate as they lay in trench, cables are not to be crossed

  • Cables Rectified before termination

  • Kerb Installed & Ground Line Known

  • Contact Site Manager to obtain Ground Level

  • Photo of GL provided

  • Service Leads in Place

  • Pit Set to height and backfilled with Sand

  • Termination into 4way connections

  • Tug Test

  • Street Light Connection

  • Fit Cable neutral ID tag

  • Photo of ID Tags

  • Date and time

  • Sign off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.