Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Site Address
-
Select date
Asbestos Management
-
If the building was built prior to 2000 does the site have an Asbestos Management Plan in the site file? (Only applies to buildings where ACM's exist on site)
-
Is the asbestos information on site up to date and in line with MICAD data?
-
Is the Asbestos Management Survey Report in the asbestos site pack?
-
Is the survey report in the site pack still relevant to the site and it's layout?
-
Is the remedial action plan from the last condition survey in the asbestos site pack?
-
Is the contractors signing in sheet in the asbestos pack?
-
Has the FM team responsible for the site received asbestos awareness training?
-
Where the BBC client has requested asbestos training, has this been provided?
-
Is the FM aware of the asbestos survey for the site and the existence of ACM's on the site?
-
Has the FM communicated the existence of ACM's and the asbestos survey for the site to all of their staff?
-
Have we ensured that the BBC Client (responsible for the facility) is aware of the existence of ACM's and the asbestos survey for the site and has communicated this information to their staff?
-
Is the FM aware of their responsibility to ensure all sub-contractors look at, understand and sign the asbestos register before any works are undertaken?
-
Has the FM ensured that the BBC Client (responsible for the facility) is aware of their responsibility to ensure all sub-contractors look at, understand and sign the asbestos register before any works are undertaken?