Quarterly Checks
Heat Exchangers
-
Examine and clean strainers
Calorifiers
-
Note hot water storage temperature and log. Adjust as necessary to achieve temperature of 60ºC.
-
Check setting of each thermostat (where fitted). Re-adjust/recalibrate where required and log
-
Check all valves and draincocks for correct operation and report any defects immediately.
-
Check operation of HWS primary controls, where fitted, re-adjust where necessary
-
Check manhole cover, bolt head and access covers for correct fit an any signs of leakage and nip up as necessary
-
Check and log water temperatures at 25% taps in a schedule to ensure that each tap is checked at least once per annum.
-
Blow down where possible to remove sediment and sludge
Half Yearly Checks
Heat Exchangers
-
Examine and clean strainers
Calorifiers
-
Note hot water storage temperature and log. Adjust as necessary to achieve temperature of 60ºC.
-
Check setting of each thermostat (where fitted). Re-adjust/recalibrate where required and log
-
Check all valves and draincocks for correct operation and report any defects immediately.
-
Check operation of HWS primary controls, where fitted, re-adjust where necessary
-
Check manhole cover, bolt head and access covers for correct fit an any signs of leakage and nip up as necessary
-
Check and log water temperatures at 25% taps in a schedule to ensure that each tap is checked at least once per annum.
-
Blow down where possible to remove sediment and sludge
-
Test safety devices.
-
Test thermostatic controls. Maintain storage at 60º.
-
Examine mountings, connections and thermal insulation
-
Clean and examine thermometers and altitude gauges
-
Examine vent pipes, ensure that are clear
Annual Checks
Heat Exchanger
-
Examine and clean strainers
-
Test safety valve
-
Test thermostatic controls
-
Check all valves and drain cocks for correct operation
-
Examine vent pipes; ensure they are clear
-
Clean and examine thermometers and altitude gauges
-
Drain heat exchangers and open up for inspection, removing all scale or deposits
-
Reinstate and test for correct operation
Calorifiers
-
Note hot water storage temperature and log. Adjust as necessary to achieve temperature of 60ºC.
-
Check setting of each thermostat (where fitted). Re-adjust/recalibrate where required and log
-
Check all valves and draincocks for correct operation and report any defects immediately
-
Check operation of HWS primary controls, where fitted, re-adjust where necessary
-
Check manhole cover, bolt head and access covers for correct fit an any signs of leakage and nip up as necessary.
-
Check and log water temperatures at 25% taps in a schedule to ensure that each tap is checked at least once per annum.
-
Blow down where possible to remove sediment and sludge
-
Test safety devices.
-
Test thermostatic controls. Maintain storage at 60º.
-
Examine mountings, connections and thermal insulation
-
Clean and examine thermometers and altitude gauges.
-
Examine vent pipes, ensure that are clear
-
Prepare for Engineers Survey Inspection as follows: (if required by client)
-
Isolate primary pipework on secondary pipework to calorifier.
-
Drain down calorifier secondary shell and remove bolted head or manhole cover for inspection.
-
Disconnect primary pipework to primary coil and withdraw coil for inspection
-
Clean primary coil and after inspection test to one and half times working pressures.
-
Clean inside of calorifier shell and remove all scale or deposits.
-
Refit bolted head, manhole and primary coil using new jointing rings.
-
Reconnect all pipework to calorifier and refill.
-
Ensure that the calorifier is on line and re-commission to working temperature.
-
Clean and disinfect system in accordance with BS6700 in conjunction with disinfection of CWS.
Coments
Warning Notices
-
Were any warning notices given?
-
Details of warning given
Engineer Report and Comments
-
Engineers Report or Comments
Further Works
-
Are further works or remedial actions required following this visit.
-
No further actions or remedial works required
-
The following further actions should be considered for the equipment serviced
Further Actions Required
-
Action
Sign Off
Location Representative Declaration
-
Please tick the following statements as conformation of completed works.
-
I confirm that the service as noted in this report was carried out
-
All immediate and further actions have been fully explained and detailed
-
If applicable, any warning notices issued have been fully explained
-
Client Signature
Elite Services Declaration
-
Please tick the following boxes as conformation of completed works
-
All site maintenance tasks completed
-
Site left clear and free of hazards
-
All equipment left operational and tested
-
All permits completed
-
Works discussed and agreed with site representative
-