Site Identification
-
Site ID:
-
Date and Time of Installation
-
Prepared by (Full Name)
-
Location
General Info and Site Preparation
General
-
Site ID:
-
Amazon POC:
-
POC Phone:
-
POC Email:
-
AHP Site Supervisor(s):
-
AHP Site Technician(s):
Work Area Preparation
-
Working Area Identified with Caution Tape/Barrier (20' Radius):
-
Staging area for materials identified?
-
Are all materials accounted for on-site?
-
What additional material is needed?
-
Lift Inspection Complete:
-
LOTO procedure completed:
-
All personnel outfitted with proper PPE?
-
AHP Site Supervisor:
General
-
Has the compressor been energized by an approved compressor representative?
-
Compressor Representative Signature
-
LOTO signage confirmed?
-
RME representative aware of functionality?
-
RME Representative Signature
-
LOTO signage affixed to all equipment disconnect points (Electrical and Pneumatic)?
Production Point
-
All wires and cables are secured with Velcro straps to avoid damage?
-
All cables secured properly?
-
All cables are covered and routed properly?
-
Has the compressor been permitted for use by local authority having jurisdiction?
-
Does each compressor have independent electrical disconnect?
-
Are Arc Flash Labels installed on all compressor panels and disconnects?
-
Are electrical panels free and clear of obstruction?
-
Are bollards installed correctly (24" from compressor system and no less than 24" between each bollard)?
-
Debris Filter Line and Condensate Return Line separated?
-
Weatherproof Knock-Out(s) Installed?
-
Condensate Container placed and labeled?
-
Condensate Container placed in Spill Tray?
-
E-Stop buttons validated? (Red Button / Yellow Background, Not Recessed)
-
Compressor secured/anchored in place to avoid shift or tipping?
-
Air Shut-Off Valves integrated with locking handle?
-
Proper LOTO documentation displayed on all Air shut-Off Valves?
Distribution Network
-
Air Piping secured and routed properly (Free of bends and restrictions)?
-
Header piping diameter confirmed and within spec (Min: 3/4" or 20mm)?
-
Drop/Supply piping diameter confirmed and within spec (Min: 1/2" or 13mm)?
-
Vertical piping secured to column or strut?
-
Air Piping installed at ceiling level free and clear of obstructions (Fans, Cabinets, Lighting etc.)?
-
All Air Piping clearly labeled as "Compressed Air" with directional flow arrows?
Point of Use
-
Flex hose from Supply to regulator secured and routed properly?
-
Regulator is maintaining 60psi reading while system is running.
-
After releasing air from regulator to 50psi, validate low compression fault.
-
induct lines, at regulator, has isolation valve, valve is accessible and lockable
Functional Test
System PSI (Commission)
-
ADTA(s) Isolated?
-
Header Isolated?
-
Compressor Isolated?
-
Baseline PSI Reading:
-
5 Minute Reading:
-
10 Minute Reading:
-
20 Minute Reading:
-
Are compressor clocks synced?
-
Amazon Site Representative/ RME:
-
AHP Site Supervisor:
-
Decibel Test: Must not exceed an equivalent-continuous sound pressure level<br>(Leq) of 77 dBA at a distance of 1 meter (39.37 in) and impulse sound pressure<br>levels shall not exceed a peak sound pressure level of 130dBC an LpC peak of<br>130 dBA at any time during operation
-
Verify with the leader or PM for the supplier that the compressors controllers<br>have been set to cycle between compressors every other day at noon (12:00<br>PM).<br>Visually verify the compressor controller operations at the display screen.<br>Verify from the menu screen that the compressors are set to Local Mode, and<br>operating in pA/pB cycle with the following parameters:<br>- pA: 125psi<br>- pB: 120psi<br>- Start time: 12:00PM<br>- Duration: 24 hours
Final House Keeping
Completion
-
Work area free of waste and cleaned?
-
Lifts returned to staging area (If applicable):
-
If no, explain:
-
Amazon Site Represenative / RME:
-
AHP Site Supervisor: