Title Page

  • Site conducted

  • Job Name & stage

  • Consultant:

  • Contractor:

  • Conducted on

  • Prepared by

Audit report. Notes and / or photos can be added at any point by selecting the Menu at the right-hand side (3 dots)

OH&S requirements satisfied including:

  • Road traffic control

  • Trench sheilds / Battered or Benched for trenches >1.5m

  • Barracads

  • Controlls for neighbouring live services

  • Correct PPE

  • Other

Pipe and Fittings

  • Pipe Material / Class conforms to design drawings / specifications

  • Pipe and fittings stored and handled appropratly and in acceptable condition

Pipe laying comforms to the Design drawings and relivent standards in respect to the following:

  • Jointing

  • Bedding

  • Depth of Sewer Main

  • Offset of Sewer main

  • Sewer connection points constructed to regulation depth below surface level

  • Appropriate Marker tape is being installed along Sewer main and Branches

  • Backfill ie; Trafficable

  • Compaction of backfill

  • Other

Manhole construction method

  • Man Hole Type

  • Manholes checked for step irons (no step irons except by prior written agreement)

Comments & Photos

  • Comments:

  • Photos

Sign Off

  • I confirm that the above works are

  • Note:

  • Name / Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.