Title Page
-
Job number
-
Job name
-
Client
-
Conducted on
-
Prepared by
-
Location
Welfare
-
Welfare sufficient
-
Add comments
-
Add comments
-
Hot water available
-
Welfare clean and maintained
-
Add comments
-
Add Media:
COSHH
-
COSHH Assessments in place
-
Add comments
-
Health hazards controlled
-
Add comments
-
COSHH Substances stored correctly
-
Add comments
-
Add Media:
First Aid
-
Sufficient numbers of trained first aiders on site
-
Add comments
-
First aid supplies suitable and accessible
-
Add comments
-
Add Media:
Fire and Emergency
-
Fire plan including emergency procedures in place
-
Add comments
-
Sufficient and suitable fire extinguishers in place
-
Add comments
-
Escape routes clear and unobstructed<br>
-
Add comments
-
Add Media:
Environmental
-
Are there any uncontrolled environmental hazards
-
Add details
-
Are there suitable spill kits in place
-
Add details
-
Add Media:
Work at height and scaffold
-
All leading edges protected
-
Add comments
-
Evidence that scaffold has been inspected within last 7 days
-
Add comments
-
All ladders in good order and secured
-
Add comments
-
Top lift double boarded and sheeted to prevent falling debris
-
Add comments
-
No uncontrolled fall risk greater than 600mm
-
Add comments
-
Add Media:
Excavations
-
Excavations part of or close to SRBS works
-
Evidence that excavations have been inspected daily
-
Add comments
-
Safe Excavation edge protection
-
Add comments
-
All excavations properly supported, stepped or graded
-
Add comments
-
Add Media:
Security, signage and traffic management
-
Site secure against public and unauthorised access
-
Add comments
-
Materials stored safely and securely
-
Add comments
-
Clear and concise safety signage in place
-
Add comments
-
Vehicles parked safely and not causing obstruction
-
Add comments
-
Traffic management measures in place or available when required
-
Add comments
-
Add Media:
General equipment
-
All hand tools are in good visible order
-
Add comments
-
All electrical tools (not battery) have had a pat test within the last 3 months
-
Add comments
-
All guards are in place and safe
-
Add comments
-
Add Media:
Plant
-
Is there plant on this project (hoists, bumpa, melting plant)
-
All plant in safe condition
-
Add details
-
Keys removed from plant and left safe when unattended
-
Add details
-
Evidence that person carrying out inspection is competent
-
Add details
-
Evidence of inspection before use and then weekly
-
Add details
-
Evidence of weekly inspection of access and lifting equipment
-
Add details
-
Add Media:
Documentation
Permits to work
-
Hot works permit in place and being adhered to
-
Add comments
-
Media:
-
General permits to work in place and being adhered to
-
Add comments
-
Media:
-
Permit to dig/enter in place and adhered to
-
Add comments
-
Media:
-
General permits to work in place and being adhered to
-
Add comments
-
Media:
Training
-
Evidence that the operatives are trained for the task
-
Add comments
-
Media:
-
Evidence of training available
-
Add comments
-
Media:
Risk assessments and method statements
-
Risk assessments site specific and available <br>
-
Add comments
-
Media:
-
Method statements site specific and register complete<br>
-
Add comments
-
Media:
-
Works being completed in compliance with RAMS
-
Add comments
-
Media:
Notices and Safety Information
-
Employers liability displayed
-
Add comments
-
Media:
-
Health and Safety at Law poster displayed
-
Add comments
-
Media:
-
F10 displayed and updated
-
Add comments
-
Media:
General Media
General Media:
-
General Media:
TOOL BOX TALK: SHEQ 031
Tool box talks
-
Tool box talk briefing register: CITB No: 3215901
-
Tool box talk subject:
-
Start Time:
-
End Time:
-
Add Operative:
Operative:
-
Operative name and signature:
Tool box talk provider:
-
Tool box talk provider: