Information
-
Audit Title
-
EDLP Melbourne Water
-
Client / Site
-
Conducted on
-
Prepared by Murray Mowat JCA Land Consultant
-
Location
-
Personnel Murray Mowat
1.0 AUDIT - INFORMATION
-
Inspector on site
-
Inspection for Melbourne Water works
- Yes
- No
-
Authority on site
-
JCA Landconsultants Reference Number:
-
Is this audit for EDLP Completion.
- Yes
- No
-
Is contractors representative present for this audit
2.0 AUDIT - CONFORMING ITEMS
-
Have damaged road and footpaths been repaired/fixed after completion of works.
-
Have all works as per conditions of agreement have been completed.
-
Trench subsidence works completed
-
Ground subsidence /top soil and seeding completed.
-
Has grass cutting been completed
-
Have culvert pits been reviewed on inspection
-
Is channel works completed
-
Has area been grassed and seeded
-
Have photos been taken of inspection
3.0 ALL Works in EDLP completed
-
Is all excess spoil removed.
-
Have all construction paperwork been sent in
-
construction verification sent to JCA LANDCONSULTANTS
-
Date all items rectified
-
Photos of inspection