Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel. Murray Mowat
-
WEATHER
- Dusty
- Dry
- Fine
- Shower's
- Damp
- Wet
- unsuitable for work
-
SITE CONDITIONS
- Dusty
- Dry
- Fine
- Shower's
- Damp
- Wet
- unsuitable for work
-
TRAFFIC MANAGEMENT
-
FENCING & O H &S SIGNAGE
1.0 ACTIVITY : CIVIL CONTRACTOR -(ROAD & DRAINAGE), ELECTRICAL, TELSTRA / NBN.
-
Drainage-Contractor Onsite
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Drainage Works Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
1.1 Works - Trenching, Pipelaying, Pits, Backfill
-
Is there an accredited pipe layer on site where required.
-
Are trench widths adequate for pipe size/ type
-
Are shields required in trench.
-
Pipes being laid as per design.
-
Does trench backfill material comply with standard drawings and specifications
-
Is the bedding material being compacted.
-
Have step irons been placed in pits.
-
Have pits been built to sizes as per design.
-
Has the concrete been placed and inside form work to specification
-
Is the surface finish of pit walls satisfactory.
-
Have Agi drains been connected into new pits.
-
Are lids / covers as per design and correct rating.
-
Had rock work bern undertaken as per design
1.2 Safety - Trenching, Pipelaying, Pits, Backfill
-
Is ground support suitable for the ground conditions and depth of excavation
-
Are workers provided with a ladder or other means of access and egress where required.
-
Are hats and vests being worn by workers where required
-
Are trenches barricaded and made safe when left open.
-
Is lifting equipment suitable for the works being carried out.
-
Are silt traps in place to prevent silt build up in previously installed drainage system.
-
Are environmental areas fenced where required.
COMMENTS / PROGRESS / INSTRUCTIONS.
-
PHOTOS