1.0 AUDIT - INFORMATION

  • Is this audit for Practical Completion.

  • Is this audit for, Melbourne Water Works

  • JCA Landconsultants Reference Number:

  • Retail Water Authority

  • Contractor:

  • Is contractors representative present for this audit

2.0 AUDIT - CONFORMING ITEMS

  • Is all excess spoil removed.

  • Has all works been completed as per design

  • Rock Work been accepted by Melb Water supervisor

  • Has timber post rail works been completed

  • Ground subsidence /top soil and seeding completed.

  • Clearance from authority's have been obtained.

  • Any obvious signs of leak's?

  • Has CCTV been undertaken

  • Was there any construction not as per design?

  • We're design plans amended and forwarded to asset recorder and water authority.

  • Have damaged road and footpaths been repaired/fixed after completion of works.

  • Any construction concessions sought from water authority. If yes confirmation of concession recorded in form G

3.0 ALL NON-CONFORMANCES RECTIFIED

  • Date all items rectified

  • Construction verification paperwork sent to JCA LANDCONSULTANTS

  • Photos of inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.