Information

  • Document No.

  • Audit Title

  • Conducted on

  • Prepared by

  • Client / Site

  • Location
  • Personnel

1.0 AUDIT - INFORMATION

  • Is this audit for Practical Completion.

  • Is this audit for, Council Works

  • JCA Landconsultants Reference Number:

  • council Project Number

  • Contractor:

  • Is contractors representative present for this audit

2.0 AUDIT - CONFORMING ITEMS

  • Is all excess spoil removed.

  • Has all works been completed as per design

  • Have all pits been cleaned and inspected

  • Have driveways been completed

  • Ground subsidence /top soil and seeding completed.

  • Have marking on kerb been undertaken

  • Any damage to kerb and channel

  • Has CCTV been undertaken

  • Was there any construction not as per design?

  • We're design plans amended and forwarded to asset recorder and water authority.

  • Any damage road and footpaths been repaired/fixed after completion of works.

  • Any construction concessions sought from water authority. If yes confirmation of concession recorded in form G

3.0 ALL NON-CONFORMANCES RECTIFIED

  • Date all items rectified

  • Construction verification paperwork sent to JCA LANDCONSULTANTS

  • Photos of inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.