Information

  • Audit Title

  • EDLP Water

  • Client / Site

  • Conducted on

  • Prepared by Murray Mowat JCA Land Consultant

  • Location
  • Personnel Murray Mowat

1.0 AUDIT - INFORMATION

  • Inspector on site

  • Is this audit for, Water

  • Authority on ste

  • JCA Landconsultants Reference Number:

  • Is this audit for EDLP Completion.

  • Is contractors representative present for this audit

2.0 AUDIT - CONFORMING ITEMS

  • Have all works as per conditions of agreement have been completed.

  • Trench subsidence works completed

  • Have damaged road and footpaths been repaired/fixed after completion of works.

  • Ground subsidence /top soil and seeding completed.

  • Any obvious signs of leak's?

  • Hydrant pits cleaned out for inspection

  • Marking on kerb & Channel

  • Has compaction tests been received at JCA Land

  • Have photos been taken of inspection

3.0 ALL NON-CONFORMANCES RECTIFIED

  • Is all excess spoil removed.

  • Have all construction paperwork been sent in

  • construction verification sent to JCA LANDCONSULTANTS

  • Date all items rectified

  • Photos of inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.