Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel. Murray Mowat
-
SITE CONDITIONS
- Dusty
- Dry
- Fine
- Shower's
- Damp
- Wet
- unsuitable for work
-
WEATHER
- Dusty
- Dry
- Fine
- Shower's
- Damp
- Wet
- unsuitable for work
-
TRAFFIC MANAGEMENT
-
FENCING & O H &S SIGNAGE
1.0 ACTIVITY : CIVIL CONTRACTOR -(ROAD & DRAINAGE), ELECTRICAL, TELSTRA / NBN.
-
Road & Drainage-Contractor Onsite
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Telstra / NBN Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Electrical Sub Contractor Onsite
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Telstra / NBN Sub Contractor Onsite
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Drainage Works Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Electrical Retic Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Conduits / AG Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Is there an accredited pipe layer on site where required.
-
Are trench widths adequate for pipe size/ type
-
Are shields required in trench.
-
Pipes being laid as per design.
-
Are pipes being installed in accordance with design specification and manufacturers recomendations.
-
Does trench backfill material comply with standard drawings and specifications
-
Are clearances to other services being maintained as per specification.
-
Is compaction testing being carried out but registered tester where required.
-
Is the bedding material being compacted.
-
Have pits been built to sizes as per design.
-
Has the concrete been placed and inside form work to specification
-
Is the surface finish of pit walls satisfactory.
-
Have step irons been placed in pits.
-
Have Agi drains been connected into new pits.
-
Are lids / covers as per design and correct rating.
-
Are thrust restraints being installed as per design where required.
1.2 Safety - Trenching, Pipelaying, Pits, Backfill
-
Is ground support suitable for the ground conditions and depth of excavation
-
Are workers provided with a ladder or other means of access and egress where required.
-
Are hats and vests being worn by workers where required
-
Are trenches barricaded and made safe when left open.
-
Is lifting equipment suitable for the works being carried out.
2.0. ACTIVITY : DEMOLITION, STRIPPING, BULK EARTHWORKS,
-
Bulk Earthworks, Cut / Fill status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Demolition / Stripping status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
2.1 Works - Earthworks, Excavation
-
Road Boxing Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Grading / Topsoiling Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
2.2 Safety - Earthworks, Excavation
-
Does plant and equipment have suitable warning lights and reversing beepers
-
Are personnel in the vicinity of operating plant wearing high vis clothing and helmets where required.
-
Are truck / scraper routes around site clearly designated and separate from public access areas.
-
Is fill being placed in layers and compacted as per specification.
-
Are compaction tests being conducted to specified Level by registered tester.
2.3 Environmental - Earthworks, Excavation.
-
Is there provision to minimize dust / mud from leaving the site.
-
Do stockpiles have adequate silt runoff protection.
-
Are silt traps in place to prevent silt build up in previously installed drainage system.
-
Are environmental areas fenced where required.
3.0. ACTIVITY : PAVEMENT
-
Class 3 FCR Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Class 2 FCR Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Asphalt Works Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Wearing Course Asphalt Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
3.1 Works - Road Construction and Footpath Area.
-
Have Agi drains been laid begin kerb and channel
-
Has proof roll been under taken for subgrade.
-
Have soft areas been repaired
-
Does pavement material comply to design.
-
Is crushed rock being placed in layers and compacted as per specification.
-
Are compaction tests being conducted to specified Level by registered tester.
-
Have light poles been installed.
-
Are conduits and AG drains at correct depth
-
Have conduits for water services in the future been laid.
-
Have conduits been placed for Telstra.
-
Have conduits been placed for electrical.
-
Have Electrical pits been installed.
-
Are Telstra pits installed
-
Has concrete footings for substation been done.
-
Correct profile for kerb and channel,been used as per design plans.
-
Is the weather suitable for priming or placing asphalt.
-
Does trench backfill material comply with standard drawings and specifications
-
Shape of asphalt directs water to kerb and channel
-
Correct size of and class of rock being laid on as
3.2 Safety - Pavement
-
Does plant and equipment have suitable warning lights and reversing beepers
-
Are personnel in the vicinity of operating plant wearing high vis clothing and helmets where required.
-
Are asphalt crews employing appropriate protective equipment.
4.0. CONCRETE
-
Kerb and Channel Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Pattern Paving Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Footpath and Crossover Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Endwall / Headwall Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
4.1 Works - Concrete
-
Is form work adequate for the structure being constructed.
-
Are weather conditions suitable for placing concrete.
-
Are access routes for trucks clearly defined
-
Is boxing depth and crushed rock bedding as per specification
-
Is reinforcing as per specification and installed correctly.
-
Are kerb markings for services being installed.
4.2 Safety - Concrete
-
Does plant and equipment have suitable warning lights and reversing beepers
-
Are concretors wearing appropriate PPE.
5.0. ACTIVITY : ROCKWORK / MISCELLANEOUS
-
Rock Wall Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Rock Endwall / Headwall Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
-
Rock Beaching Status
- Works not ready to start
- Not/Applicable to site
- Delayed
- Setting up on site
- Commenced work
- Progressing on site
- Nearing completion
- Testing of finished works required
- Works completed
- Signed of by authority
5.1 Works - Rockwork, Miscellaneous
-
Are rocks suitable for intended purpose and of appropriate size/ grading.
-
Are rocks sitting on concrete cushions over pipe ends
-
Are rocks being placed to specification and grouted as required.
-
Is reinforcing being installed as per specification.
5.2 Safety - Rockwork, Miscellaneous
-
Does plant and equipment have suitable warning lights and reversing beepers
-
Are contractors wearing appropriate PPE.
-
Are personnel in the vicinity of operating plant wearing high vis clothing and helmets where required.
COMMENTS / PROGRESS / INSTRUCTIONS.
-
PHOTOS