Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel. Murray Mowat

  • SITE CONDITIONS

  • WEATHER

  • TRAFFIC MANAGEMENT

  • FENCING & O H &S SIGNAGE

1.0 ACTIVITY : CIVIL CONTRACTOR -(ROAD & DRAINAGE), ELECTRICAL, TELSTRA / NBN.

  • Road & Drainage-Contractor Onsite

  • Telstra / NBN Status

  • Electrical Sub Contractor Onsite

  • Telstra / NBN Sub Contractor Onsite

  • Drainage Works Status

  • Electrical Retic Status

  • Conduits / AG Status

  • Is there an accredited pipe layer on site where required.

  • Are trench widths adequate for pipe size/ type

  • Are shields required in trench.

  • Pipes being laid as per design.

  • Are pipes being installed in accordance with design specification and manufacturers recomendations.

  • Does trench backfill material comply with standard drawings and specifications

  • Are clearances to other services being maintained as per specification.

  • Is compaction testing being carried out but registered tester where required.

  • Is the bedding material being compacted.

  • Have pits been built to sizes as per design.

  • Has the concrete been placed and inside form work to specification

  • Is the surface finish of pit walls satisfactory.

  • Have step irons been placed in pits.

  • Have Agi drains been connected into new pits.

  • Are lids / covers as per design and correct rating.

  • Are thrust restraints being installed as per design where required.

1.2 Safety - Trenching, Pipelaying, Pits, Backfill

  • Is ground support suitable for the ground conditions and depth of excavation

  • Are workers provided with a ladder or other means of access and egress where required.

  • Are hats and vests being worn by workers where required

  • Are trenches barricaded and made safe when left open.

  • Is lifting equipment suitable for the works being carried out.

2.0. ACTIVITY : DEMOLITION, STRIPPING, BULK EARTHWORKS,

  • Bulk Earthworks, Cut / Fill status

  • Demolition / Stripping status

2.1 Works - Earthworks, Excavation

  • Road Boxing Status

  • Grading / Topsoiling Status

2.2 Safety - Earthworks, Excavation

  • Does plant and equipment have suitable warning lights and reversing beepers

  • Are personnel in the vicinity of operating plant wearing high vis clothing and helmets where required.

  • Are truck / scraper routes around site clearly designated and separate from public access areas.

  • Is fill being placed in layers and compacted as per specification.

  • Are compaction tests being conducted to specified Level by registered tester.

2.3 Environmental - Earthworks, Excavation.

  • Is there provision to minimize dust / mud from leaving the site.

  • Do stockpiles have adequate silt runoff protection.

  • Are silt traps in place to prevent silt build up in previously installed drainage system.

  • Are environmental areas fenced where required.

3.0. ACTIVITY : PAVEMENT

  • Class 3 FCR Status

  • Class 2 FCR Status

  • Asphalt Works Status

  • Wearing Course Asphalt Status

3.1 Works - Road Construction and Footpath Area.

  • Have Agi drains been laid begin kerb and channel

  • Has proof roll been under taken for subgrade.

  • Have soft areas been repaired

  • Does pavement material comply to design.

  • Is crushed rock being placed in layers and compacted as per specification.

  • Are compaction tests being conducted to specified Level by registered tester.

  • Have light poles been installed.

  • Are conduits and AG drains at correct depth

  • Have conduits for water services in the future been laid.

  • Have conduits been placed for Telstra.

  • Have conduits been placed for electrical.

  • Have Electrical pits been installed.

  • Are Telstra pits installed

  • Has concrete footings for substation been done.

  • Correct profile for kerb and channel,been used as per design plans.

  • Is the weather suitable for priming or placing asphalt.

  • Does trench backfill material comply with standard drawings and specifications

  • Shape of asphalt directs water to kerb and channel

  • Correct size of and class of rock being laid on as

3.2 Safety - Pavement

  • Does plant and equipment have suitable warning lights and reversing beepers

  • Are personnel in the vicinity of operating plant wearing high vis clothing and helmets where required.

  • Are asphalt crews employing appropriate protective equipment.

4.0. CONCRETE

  • Kerb and Channel Status

  • Pattern Paving Status

  • Footpath and Crossover Status

  • Endwall / Headwall Status

4.1 Works - Concrete

  • Is form work adequate for the structure being constructed.

  • Are weather conditions suitable for placing concrete.

  • Are access routes for trucks clearly defined

  • Is boxing depth and crushed rock bedding as per specification

  • Is reinforcing as per specification and installed correctly.

  • Are kerb markings for services being installed.

4.2 Safety - Concrete

  • Does plant and equipment have suitable warning lights and reversing beepers

  • Are concretors wearing appropriate PPE.

5.0. ACTIVITY : ROCKWORK / MISCELLANEOUS

  • Rock Wall Status

  • Rock Endwall / Headwall Status

  • Rock Beaching Status

5.1 Works - Rockwork, Miscellaneous

  • Are rocks suitable for intended purpose and of appropriate size/ grading.

  • Are rocks sitting on concrete cushions over pipe ends

  • Are rocks being placed to specification and grouted as required.

  • Is reinforcing being installed as per specification.

5.2 Safety - Rockwork, Miscellaneous

  • Does plant and equipment have suitable warning lights and reversing beepers

  • Are contractors wearing appropriate PPE.

  • Are personnel in the vicinity of operating plant wearing high vis clothing and helmets where required.

COMMENTS / PROGRESS / INSTRUCTIONS.

  • PHOTOS

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.