Title Page

  • Job Number

  • General Contractor

  • Conducted on

  • Project Manager

  • Temperature

  • Location In Building

  • Confirm areas have backing installed for component attachment

  • Notes

  • Add media

  • Confirm products are built per approved component drawings

  • Notes

  • Add media

  • Confirm products are anchored with mortor/epoxy, or engineered drawings. (If applicable)

  • Notes

  • Add media

  • Confirm product is anchored at each anchor point, per engineered drawings. Anchors are embedded in sealant at exterior areas

  • Notes

  • Add media

  • Confirm joints are recessed to receive mesh tape/resin/bondo/etc. as needed

  • Notes

  • Add media

  • Confirm products are plumb, true and square

  • Notes

  • Add media

  • Confirm products have been straight-lined after completion

  • Notes

  • Add media

  • Confirm conformity and condition of cast products

  • Notes

  • Add media

  • Sign Off

  • Forman

  • Q.C. Sign Off

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.