Title Page
-
Job Number
-
General Contractor
-
Conducted on
-
Project Manager
-
Temperature
-
Location In Building
-
Prior to one-side
-
Confirm electrical boxes are not protruding beyond stud plane
-
Notes
-
Add media
-
Confirm MEP strapping not bulging beyond stud plane
-
Notes
-
Add media
-
Confirm MEP strapping does not overlap and cause bulging
-
Notes
-
Add media
-
Confirm all framing; backing and HMD have not been damaged
-
Notes
-
Add media
-
Confirm framing and MEP installation is signed-off for close up
-
Notes
-
Add media
-
One-Side
-
Confirm HM doors are plumb and true
-
Notes
-
Add media
-
Confirm correct fasteners are spaced per plans and specs
-
Notes
-
Add media
-
Confirm joints are butted per plans and specs
-
Notes
-
Add media
-
Confirm control joints are installed per plans and specs
-
Notes
-
Add media
-
Double Up
-
Confirm track cavities are cleaned
-
Notes
-
Add media
-
Confirm wall insulation installed where required
-
Notes
-
Add media
-
Confirm joints are butted per plans and specs
-
Notes
-
Add media
-
Confirm control joints are installed per plans and specs
-
Notes
-
Add media
-
Confirm vertical board joints are staggered 1-stud bay minimum at both sides of rated walls
-
Notes
-
Add media
-
Sign Off
-
Forman
-
Q.C. Sign Off
-
Comments