Zawarmala Face development checklist

SUPPORTING CHECKLIST

  • Gas monitoring done

  • Adequate ventilation

  • Water spraying done

  • Proper Loose Dressing upto 30m outbye from face

  • Mucking after scaling

FACE DRILLING CHECKLIST

  • Loose dressing by jumbo

  • Manual loose dressing prior to service installation

  • Supporting as per SSR, Grid

  • Misfire handling

  • Socket cleaning and plugging

  • Profile/Face marking

PRIOR TO CHARGING

  • Face is supported upto 0.6m (roof)

  • Face is supported upto 0.6m (side wall)

  • Manual loose dressing done at face

  • Lifting equipment for scaling @ >3.5m

  • Check scaling done before charging

  • Length of hole checked and cleaned

  • Loading stick used of 4m length

  • Line hole drilling done

DURING CHARGING

  • Lifting equipment used for charging

  • Line holes left uncharged

  • Minimum length of stemming 0.6m

  • Correct delay sequence as per plan

NOTE:

  • Face drilling should always start from bottom to top

  • Incase of misfire and blown-out development, supervisors need to assess the hazard as per SOP

  • Charging should always happen from top to bottom

FACE PROFILE CHECKLIST

  • Face profile scenarios

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.