Title Page
-
Conducted on
-
Prepared by
-
Location
Helping Hand Brackets Installation
-
Is the Tyvek complete and signed off?
-
Have materials been stored in a dry location?
-
Are brackets set out in accordance the latest construction issued drawings and to the fixing pattern shown on the subgrid setting outs?
-
Have the correct sized brackets been used in accordance with the latest drawings?
-
Have all brackets been installed with a thermal packer behind the brackets?
-
Are brackets at the correct centres?
-
Are all brackets aligned and plumb?
-
Are fixings used as per latest Rev and correct amount of fixings used to secure brackets?
-
Any additional holes made into the membrane been sealed and taped?
-
HOLD POINT
Insulation Installation
-
Are workers using suitable level of PPE as per Toolbox Talk given?
-
Has products been kept in a dry storage proir to installation?
-
Has the slabs been installed in the correct orientation with the outer leaf of the insulation facing away from the building?
-
Are joints tightly butted together and staggered with a minimum of 100mm distance?
-
Is the installation cut oversized (5mm overcut) to be installed tight and compressed giving maximum thermal efficiency?
-
Are fixings used in conjunction of latest Rev fixing schedule?
-
Has no. 1 stainless steel washer been installed to the centre of the slab?
-
Has polypropylene washers been installed to the top and bottom joints of the slab?
-
Are the mechanical fixings not overtightened as surface compression of the product is not recommended.
-
HOLD POINT
Rails installation
-
Have the rails been set out and installed to the latest setting out drawings?
-
Are all rails plumb and level before securing?
-
Has a cavity gap of 21mm (Trapezoidal) / 54mm (Aluminium) been maintained between the face of rail and insulation?
-
Are the fixings used in conjunction with the latest fixing schedule?
-
Has 4no. fixings been installed to the dead load holes of the double fix point brackets?
-
Has 2no. fixings been installed to the sliding holes of the single sliding point brackets?
-
Has 2no. fixings been installed to the dead load holes of the single fix point brackets?
-
Have movement gaps been maintained?
-
May next task commence?
-
HOLD POINT
Sign Off
-
A2O Representative
-
Subcontractors Supervisor