Title Page
-
Conducted on
-
Prepared by
-
Job Number
-
Dish installed correctly.
-
Cable fully checked and compliant.
-
Passing Data logs run at Dish and STB.
-
LNB correctly fitted, skew set and rain cover pulled down.
-
Compliant F connectors correctly installed at Dish and STB.
-
Cable properly clipped to the wall with acceptable distance between clips.
-
Cable entry point sealed.
-
Software downloaded.
-
Passing Chrome run and system stress tested.
-
Rubbish removed from site.
-
Customer walk through and showcase completed.
-
ACE promoted.
-
NPS promoted.
-
Provide pictures of Dish,Cable and sealed entry point.
-
Signature