Audit Protocol for MG SWP CP3.004
6.1 – Start Test
-
Has it been confirmed that only one half of the earthing bed has been disconnected?
-
Were HV insulating gloves worn while disconnecting the earthing beds?
6.2 – Conduct Safety Check of Earthing System
-
Has all safety equipment been installed as required?
-
Has the AC voltage been measured and recorded?
6.3 – Connect Temporary Bond Cable across Terminals
-
Has the temporary bond cables between the pipeline and earthing bed been installed?
6.4 – Disconnect Bridging Link
-
Has the bridging link been disconnected?
6.5 – Use Ammeter to Measure DC Current Flow between Pipeline and Earthing Bed
-
Has the DC current flow been recorded in the result sheet?
6.6 – Measure Zinc Earthing Bed Resistance
-
Has the zinc earthing bed resistance been measured and recorded in the result sheet?
6.7 – Reconnect Bridging Link
-
Have the steps been repeated for the second half of the earthing bed?
6.8 – Have both halves of earth bed been tested?
-
Have both halves of the earthing bed been tested?
6.9 – Prepare to Test Second Half of Earthing Bed
-
Has the temporary bond cable between the pipeline and the earthing bed been installed?
6.10 – Finish
-
Have the connections been returned to their original state?
Comments & Sign Off
-
Comments and Audit Findings Summary
-
Auditor(s) Sign off
-
Auditee (Crew Leader) Sign Off