Title Page
-
Audit Detail
-
Job Description
-
Service Provider
-
Subcontractor
-
Crew Leader
-
Location
-
Conducted on
-
Prepared by
Audit Protocol for MG SWP CP6.002
6.1 – Start Chart
-
Are they new or existing pipelines?
-
Are they “gased” or “ungased” pipelines?
6.2 – Cut cables to length
-
Have cables been cut correctly?
6.3 – Prepare pipe and cables for connection to test point
-
Have pipes and cables been connected to test point with reference to appropriate drawings?
6.4 – Is this a location where recording instruments will be used?
-
Will recorders be used?
6.5 – Install earth rod or permanent reference
-
Has the earth rod or permanent reference been installed correctly?
6.6 – Are anodes to be installed at this location?
-
Are anodes to be installed at this location?
6.7 – Install anodes as per MG SWP CP6.003 Installation of Sacrificial Anodes
-
Have anodes been installed in accordance with MG SWP CP6.003?
6.8 – Coil cables neatly at top of trench
-
Have cables been prepared correctly?
6.9 – Dig trench for cables and upstand or ground-mounted test point
-
Is there a trench for cables and test point?
6.10 – Above ground type test point?
-
Is this an above ground test point?
6.11 – Lay cables in trench and through upstand to exit test point head
-
Have cables been laid correctly?
6.12 – Install test point and secure upstand with concrete
-
Has test point been installed correctly?
6.13 – Terminate cables on studs inside test point head
-
Have cables been terminated correctly?
6.14 – Lay cables in trench to test point location
-
Have cables been laid correctly?
6.15 – Fit cable lugs for flush-mounted test points
-
Have cable lugs been laid correctly?
6.16 – Draw site sketch detailing location of test point
-
Does the site sketch detail the test point location and has the “Test Point Data Collection Sheet” been completed appropriately?
Comment and Sign Off
-
Comment and Audit Finding Summary
-
Auditor(s) Sign Off
-
Auditee (Crew Leader) Sign Off