Audit Protocol for MG SWP CP5.003

6.1 – Start Chart

  • Has a work order been issued for a CP system Design?

6.2 – Is the structure suitable for effective cathodic protection?

  • Is the pipeline suitable for effective cathodic protection?

6.3 – Recommend Remedial Action

  • Has remedial action been recommended?

6.4 – Calculate Current Requirements

  • Was the CPS design spreadsheet used to calculate current requirements?

6.5 – Site Selection and Soil Resistivity Measurements

  • Was a suitable site identified for soil resistivity and a field sketch completed?

  • Has a soil sample been tested?

6.6 – Design System

  • Was the spreadsheet used to determine the number and spacing of the anodes?

6.7 – Approval

  • Was verbal approval given?

6.8 – Finish

  • Create ERP WO for the installation of galvanic anode system

Comment and Sign Off

  • Comment and Audit Summary Findings

  • Auditor(s) Sign Off

  • Auditor (Crew Leader) Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.