Audit Protocol for MG SWP CP5.003
6.1 – Start Chart
-
Has a work order been issued for a CP system Design?
6.2 – Is the structure suitable for effective cathodic protection?
-
Is the pipeline suitable for effective cathodic protection?
6.3 – Recommend Remedial Action
-
Has remedial action been recommended?
6.4 – Calculate Current Requirements
-
Was the CPS design spreadsheet used to calculate current requirements?
6.5 – Site Selection and Soil Resistivity Measurements
-
Was a suitable site identified for soil resistivity and a field sketch completed?
-
Has a soil sample been tested?
6.6 – Design System
-
Was the spreadsheet used to determine the number and spacing of the anodes?
6.7 – Approval
-
Was verbal approval given?
6.8 – Finish
-
Create ERP WO for the installation of galvanic anode system
Comment and Sign Off
-
Comment and Audit Summary Findings
-
Auditor(s) Sign Off
-
Auditor (Crew Leader) Sign Off