Title Page

  • Audit Title

  • Job Description

  • Conducted on

  • Prepared by

  • Location
  • Service Provider

  • Subcontractor

  • Crew Leader

Audit Protocol for MG SWP CP3.003

6.1 – Receive Instruction to conduct Earth Electrode Measurement

  • Have instructions from the Supervisor been received to conduct the earth resistance measurement?

6.2 – Install Earth Spikes

  • Have the electrodes been inserted at the correct intervals?

6.3 – Connect Leads

  • Have the leads been connected correctly?

6.4 – Measure Resistance

  • Was the resistance measurement obtained?

6.5 – Record Results

  • Have the results been recorded?

6.6 – Submit Results to Supervisor

  • Have the results been submitted to the Supervisor?

6.7 – Finish

  • Has site been packed up and made safe?

Comment & Sign Off

  • Comments and Audit Finding Summary

  • Auditor(s)

  • Auditee (Crew Leader)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.