Title Page

  • Audit Title

  • Job Description

  • Conducted on

  • Prepared by

  • Location
  • Service Provider

  • Subcontractor

  • Crew Leader

Audit Protocol for MG SWP CP3.003

6.1 – Receive Instruction to conduct Earth Electrode Measurement

  • Work Order has been received to conduct earth resistance measurement?

6.2 – Install Earth Spikes

  • Have electrodes been inserted to obtain resistance measurement correctly?

6.3 – Connect Leads

  • Have leads been connected correctly?

6.4 – Measure Resistance

  • Was resistance measurement obtained?

6.5 – Record Results

  • Have the results been recorded?

6.6 – Submit Results to Supervisor

  • Have the results been submitted to Supervisor?

6.7 – Finish

  • Has the work area been left in a safe state with all equipment accounted for?

Comment & Sign Off

  • Comments and Audit Finding Summary

  • Auditor(s)

  • Auditee (Crew Leader)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.