Audit Protocol for MG SWP CP3.003
6.1 – Receive Instruction to conduct Earth Electrode Measurement
-
Work Order has been received to conduct earth resistance measurement?
6.2 – Install Earth Spikes
-
Have electrodes been inserted to obtain resistance measurement correctly?
6.3 – Connect Leads
-
Have leads been connected correctly?
6.4 – Measure Resistance
-
Was resistance measurement obtained?
6.5 – Record Results
-
Have the results been recorded?
6.6 – Submit Results to Supervisor
-
Have the results been submitted to Supervisor?
6.7 – Finish
-
Has the work area been left in a safe state with all equipment accounted for?
Comment & Sign Off
-
Comments and Audit Finding Summary
-
Auditor(s)
-
Auditee (Crew Leader)