Title Page
-
Audit Title
-
Job Description
-
Conducted on
-
Prepared by
-
Location
-
Service Provider
-
Subcontractor
-
Crew Leader
Audit Protocol for MG SWP CP3.001
6.1 – Confirm Unit Details
-
Have CPU details been recorded in the Survey Record?
6.2 – Is the unit operational?
-
Was the CPU checked and found to be operational?
6.3 – Check Unit and Record Fault
-
Was the fault-finding procedure followed correctly and recorded on the spreadsheet?
-
Was a licenced electrician required?
6.4 – Is the unit operational?
-
Was the CPU checked and found to be operational?
6.5 – Record Details of Unit Fault and Notify Supervisor
-
Were details of the fault recorded and the Supervisor notified?
6.6 – Record Output Current of each Pipeline Circuit
-
Were details recorded for each Pipeline Circuit?
6.7 – Does the unit require adjustment?
-
Were readings compared with previous results and total output in accordance with ESV requirements?
6.8 – Adjust Cathodic Protection Unit
-
Has the CPU been adjusted correctly?
6.9 – Record General Condition of Cabinet, Hinges and Locks, and Internal Wiring
-
Have all readings and checks been performed at periodic inspections?
6.10 – Record any Access Problems Identified
-
Any problems accessing the cabinet?
6.11 – Is it monthly monitoring or six monthly maintenance?
-
Does this CPU require monthly or six monthly monitoring?
6.12 – Finish Monthly Monitoring
-
Is monthly output current in accordance with ESV requirements?
6.13 – Maintenance Inspection of CPU
-
Anode ground bed, cabling, connections and power supply equipment inspected?
-
Have voltage and current outputs been recorded?
-
Any loop resistance checks conducted with problems indicated?
6.14 – Maintenance Inspection of Ground Bed
-
Any ground disturbance near cables/new structures?
6.15 – Finish Maintenance Inspection
-
Have any required ERP updates been recorded for later input?
Comments and Sign Off
-
Comments and Audit Findings Summary
-
Auditor(s) sign off
-
Auditee (Crew Leader) Sign Off