Title Page

  • Audit Title

  • Job Description

  • Location
  • Service Provider

  • Subcontractor

  • Crew Leader

  • Conducted on

  • Prepared by

Audit Protocol for MG SWP CP3.004

6.1 – Start Test

  • Have the electrodes been connected correctly on the first half of the earthing bed?

  • Were HV insulating gloves worn?

6.2 – Conduct Safety Check of Earthing System

  • Has all safety equipment been installed correctly, and voltage recorded?

6.3 – Connect Temporary Bond Cable across Terminals

  • Have the temporary bond cables between terminals been connected?

6.4 – Disconnect Bridging Link

  • Has the bridging link been disconnected?

6.5 – Use Ammeter to Measure DC Current Flow between Pipeline and Earthing Bed

  • Has the DC current flow been recorded in the Result Sheet?

6.6 – Measure Zinc Earthing Bed Resistance

  • Has the zinc earthing bed resistance been recorded in the Result Sheet?

6.7 – Reconnect Bridging Link

  • Have the steps been repeated for the second half of the earthing bed?

6.8 – Have both halves of earth bed been tested?

  • Have both halves of the earthing bed been tested?

6.9 – Prepare to Test Second Half of Earthing Bed

  • Have the temporary bond cables between terminals been connected for the second half?

6.10 – Finish

  • Have results been recorded for both halves of the earthing bed?

Comments & Sign Off

  • Comments and Audit Findings Summary

  • Auditor(s) Sign off

  • Auditee (Crew Leader) Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.