Title Page

  • Audit Title

  • Job Description

  • Service Provider

  • Subcontractor

  • Crew Leader

  • Location
  • Prepared by

  • Conducted on

Audit Protocol for MG SWP CP2.002

6.1 – Equipment Check

  • Has multimeter/copper sulphate reference cell/data logger been calibrated in the last 12 months?

  • Does the copper sulphate solution cover the rod?

6.2 – Cathodic Protection Units

  • Were CPUs that require overnight switching activated correctly?

6.3 – Locate and Open Test Point

  • Were any faults detected with the test point, support post (if above ground), cables or connections managed correctly?

6.4 – Place Reference Electrode

  • Was the reference electrode positioned correctly into the ground?

6.5 – Measure Potential of Earth Stake

  • Was the potential cable value below expected values?

6.6 – Is earth stake potential more negative than -200mV to reference cell?

  • Is a temporary earth stake required?

6.7 – Install Temporary Earth Stake

  • If a temporary earth stake was used, was it allowed to polarise for at least 24 hours?

6.8 – Is it a data logger?

  • Has test point information been recorded in ERP?

6.9 – Configure Data Logger

  • Has the data logger been configured as per the instruction manual?

6.10 – Connect Data Logger to Test Point

  • Has the data logger been connected correctly to the test point?

6.11 – Record Data Logger Details

  • Has the data logger serial number and time installed been recorded against the test point?

6.12 – Pick up Data Logger

  • Did the data logger record the minimum period?

  • Has the data logger been removed from the test point and chart downloaded?

6.13 – Is data valid?

  • Was the chart checked for anomalies or invalid data?

6.14 – Determine Cause of Failure

  • Has a cause been identified for any invalid data?

6.15 – Repeat Recording

  • Is the data logger faulty?

6.16 – Save Chart

  • Was the data logger chart saved correctly for assessment?

  • Did the CPU require adjustment?

6.17 – Finish

  • Has the data logger been marked as picked up on the Survey Record?

Comments & Sign Off

  • Comments & Audit Finding Feedback

  • Auditor(s) Sign off

  • Auditee (Crew Leader) Sign off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.