Title Page
-
Document No.
-
Westconnex M4E - Parramatta Rd Civil
-
Work Pack Activity /Task
-
Work Pack Number
-
Conducted on
-
Prepared By
- Daniel Taylor
- Simon Baldwin
- Michael Paton
- Pauric Smith
- Patrick Deed
- Ben Ashcroft
- David Wilson
- Brandon Leong
- Dave King
- Peter Masiororski
- Ben Forbes
- Vaughn Kimmins
- Mitch Stevens
- Bob Isaac
- John Kim
-
Additional Members on Inspection
- Daniel Taylor
- Simon Baldwin
- Michael Paton
- Pauric Smith
- Patrick Deed
- Ben Ashcroft
- David Wilson
- Brandon Leong
- Dave King
- Peter Masiororski
- Ben Forbes
- Vaughn Kimmins
- Mitch Stevens
- Bob Isaac
- John Kim
-
Supervisor responsible for Work Area
-
1. Work sequence undertaken as per Work Pack
COMPLIANCE WITH SAFETY ESSENTIALS
-
1. Working at Heights - above 2 meters
-
How is work being preformed ?
-
Is Operator ticketed and VOCed
-
Is EWP prestart completed
-
Are safety harness / lanyards inspected and tagged<br>(Red) Jan - March<br>(Green) April - June<br>(Blue) July - Sept<br>(Yellow) Oct - Dec <br>
-
Is the EWP set up on a stable surface clear of open edges
-
Is there a valid and in date Scaff-Tag
-
Add media
-
2. Working Near Mobile Plant - Workers are clear of POZ while plant is operating
-
If at risk what actions have been implemented to control
-
3. Temporary Works - Has a Certified design been developed by and engineer, has it been verified for use, has a pre loading inspection been completed by a competent person.
-
If at risk what actions have been implemented to control
-
4. Working Near Live Services - Have all known services been physically identified, operators know the safe approach distances as per the Permit?
-
If at risk what actions have been implemented to control
-
5. Working Near Live Traffic
-
Could road closures, detours and traffic staging have eliminated the need to work near live traffic
-
Have suitable barriers been erected to protect workers
-
If at risk what actions have been implemented to control
-
6. Mobile Cranes and Lifting Operations - Has a Lift Study, Plan been identified for the lift / has a Pre-Lift Start Card been used in compliance
-
If at risk what actions have been implemented to control
-
7. Electrical - Is there a physical gap between wiring systems - has there been a test for dead prior to work - are all isolation in place - what surrounding wires are exposed that could be a hazard
-
If at risk what actions have been implemented to control
Work Area
-
1. Are walkways and exclusion zones clearly delineated
-
2. Are personnel using the designated walkways, barriers, signs and information tags are visible, legible and in place.
-
3. Are Barriers, signs and information tags are visible, legible and in place.
-
4. Is the work area free of dust ?
-
Can the dust be prevented
-
Are workers using suitable respiratory protection (P2 Dust Masks)
-
Are workers wearing as a minimum Class 4 or above hearing protection where mandatory hearing protection is prescribed?
-
Housekeeping is well controlled
-
Plant, tools and equipment being used are correct
-
Have pre-start checks been completed on mobile plant or equipment by the operators?
-
Does Mobile Plant or Equipment have a current inspection tag indicating this months?
-
"Above the line"controls in place for high risk work
-
'Above the line' controls have been implemented for this activity or task:- Above the Line Controls = Elimination - Substitution - Isolation - Engineering
-
Materials used are verified as acceptable
-
Inspection, test and control points being observed
-
Environmental controls in place
SWMS Review Checklist
-
Has SWMS been signed off by the Project Manager?
-
Have all the workers signed onto the SWMS?
-
Photo of the SWMS sign on page
-
Have there being any changes to the SWMS?
-
Has the Project Manager authorised the changes?
-
Are all the controls in place?
-
Are there any new hazards?
-
Action Required - What can be done to control the hazard identified - Fix - Report - Esculate
-
Is work proceeding in compliance to the SWMS?
-
Do the workers know to stop work if a non compliance is identified, and only restart when the SWMS can be complied with?
-
Action required:
-
Assigned to:
-
Date due
-
Lead observer to sign