Title Page
-
Conducted on
-
Prepared by
-
Location
1. TEAM MEMBERS
-
1.1 Morning shift team members work on time (7am & 8am)
-
1.2 Team members clock in through herdhr
-
1.3 Team members in uniform before 10am (Chef jacket, Apron, Chef net, Chef hat, Gloves & Mask)
-
1.4 Team members familiar with forecast daily
-
1.5 Team members send opening photos in WhatsApp group
2. PRODUCTS
-
2.1 Sequence of team members doing preparation
-
2.2 First batch dough condition
-
2.3 Standby sauce is ready and keep in chiller
-
2.4 Team members measure the dough with vernier calliper
-
2.5 Egg wash jar and syrup jar is wrapped with cling wrap & keep in a chiller
-
2.6 Team members deco flavour according to daily forecast
3. CLEANING
-
3.1 All cloths are non-greasy & washed
-
3.2 Sink is clean , neat & tide
-
3.3 Floor is clean before 10am
-
3.4 Glasses are free from stain, dust & dirt (Use vision for cleaning)
-
3.5 No overnight rubbish leave in outlet
-
3.6 Dustbin with new trash bag
-
3.7 Grease trap is clean
-
3.8 All price tags is clean and presentablel
4. CASHIER & DISPLAY AREA
-
4.1 Check wifi availability
-
4.2 All POSM are presentable and verified
-
4.3 Ensure the POS system & machine is functioning smoothly (GHL terminal, Foodpanda device, Grabfood device)
-
4.4 Ensure the petty cash
-
4.5 Ensure the paid out receipt is paste behind closing report
-
4.6 Staff done calculating petty cash and open shift before 10am
-
4.7 Are the display shelves fully stocked?
-
4.8 Does team member use their own PIN code for POS system?
5. EQUIPMENTS / HARDWARES
-
5.1 All lights on before 10am
-
5.2 TV on with correct content before 10 am
6. STORAGE
-
6.1 Packaging drawer full of packaging (Single box, Single paperbag, plastic bag, 6pcs boxes & paper bag)
-
6.2 Outlet has sufficient frozen goods & dry goods