Information
-
Document No.
-
Audit Title
-
Client / Site (displayed on front page)
-
Conducted on
-
Prepared by
More than one auditor?
-
Additional auditors
-
Housekeeping maintained to a high standard (tools stored correctly, leads elevated on lead stands, signage erected, no trip hazards)
-
Waste containers provided and used?
-
Sharp objects / edges covered or protected?
-
Fire extinguishers identified, uninstructed and within inspection date?
-
RCD's on all electrical equipment?
-
Electrical equipment tagged and tested (current quarter)?
-
Welders fitted with flashback arrestor?
-
Tools and equipment stored correctly?
-
Guarding fitted to equipment (saws, grinders, rotating equipment)
-
Welding screens in use?
-
All leads elevated off the ground on lead stands?
-
Gas cylinders stored correctly?
-
Emergency response procedure known (immediate contacts, muster point)?
-
Materials stored correctly (e.g. Hazardous substances in designated locked cabinet / facility, tools and equipment stored in designated areas)?
-
Smoking procedure followed (no smoking outside of designated smoking areas)?
-
Correct PPE being used?
-
Noise mitigation and attenuation measures in place for plant and equipment to limit construction noise (EMP PDS 2)
-
Effective waste management maintained (segregation of waste, bins emptied, recycling facilities etc) (EMP PDS 6)
-
Chemicals are stored correctly with MSDS and MSDS register in place (EMP PDS 9)?
-
Bunds are in place for mechanical equipment (fuel-powered) such as generators, pumps and fuel trailers (EMP PDS 9)
-
Oil spill response kits stocked and located in appropriate areas and staff trained in their use (EMP PDS 10)?
-
Add location
-
Signed PoMC Representative:
Action required?
-
Action
-
Action due
-
Allocated to
-
Signed Principal Contractor Representative (optional):