Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
City conducted:
-
PN Number:
-
Principle contractor:
-
Sub contractor (if applicable):
-
Please remember to provide photo evidence for all applicable questions
Pole Inspection
-
What is the Pole ID?
Pole Check/Test
-
Is there any sign of damage to the pole? (Damage caused by hedge trimming, vehicle damage, Vandalism etc.)
-
D = Defective (Decay) DO NOT CLIMB
SC= Shallow climbable SD= Shallow depth (THESE POLES SHOULD NOT BE CLIMBED)
H + Z = Hazard near the pole, if an engineer can safely position their ladder in such a way to reduce the hazard then the pole can be climbed. -
Is there a D, SC, SD, H or Z tag?
-
Is there any decay or rot suspected on the pole?
-
Is there any bleeding apparent on the pole
ASN Checks
-
Is there CityFibre equipment attached to the pole?
Good Practice & Sign Off
-
Please give a description of the practice you have observed and would like recognised
-
Sign Off
-
Auditor Signature