Information
-
Job Number
-
Customer Name
-
Date of Visit
-
Tech Code
-
Engineer
-
Post Visit Conducted on
-
Completed By
-
Job Type
-
Ladder Used
-
Location
-
TM Comments
-
Engineer Comments
-
Actions Given
ETA Procedure
-
Did the Engineer call with an ETA
-
Was this in the morning or Night before visit
-
Did the engineer arrive within agreed ETA
-
Updated ETA given - If Applicable
Customer Interaction
-
Did the Engineer introduce himself and show his Name Badge<br>
-
Uniform Worn - Was it Clean and Tidy
-
Did the Engineer confirm the job details with you<br>
-
Did the Engineer show you the work that was going to be carried out
-
Did the Engineer show you completed work
Service Only
-
Did the engineer discuss the Fault History with you
-
Has the fault now been rectified
-
Did the Engineer carry out a physical check on the dish
Telecom Installation
-
Cable routing agreed with you
-
STB Connected and Call-back can be achieved
Dish and Cable Installation
-
Dish position and cable routing agreed with customer
-
Dish and Cable Installed to best practises<br><br>
-
Were any necessary escalations made<br>
-
Cable entry hole sealed and brick burst plate used
-
Internal bush used
Customer Demonstration
-
Demonstration completed to your satisfaction
-
RCU programmed to work the customer TV
-
Was aftercare promoted and card left on-site
-
Was an HD Customer Demonstration leaflet left on-site and explained
-
Anytime+ or other products offered / promoted
-
Any customer issues outstanding
Job Closure
-
Site left clean and tidy
-
Did customer sign MFT Device
NPS / CSAT
Pictures of Visit
-
Pictures